§ 15.44.060 — Safety measures designated – Compliance required
Municipal Code of the City of Chula Vista, California (Chula Vista Municipal Code current through Ordinance 3626, passed August 18, 2026 (municipal.codes publication, scraped 2026-11-17)) · Chula Vista Municipal Code § 15.44.060
Corpus is an independent public-information project, not the official City of Chula Vista website. Stable reference: corpuslaw.us/code/3ce4d6c3-9430-42a9-8f52-055cd3363a7a
15.44.060 Safety measures designated – Compliance required.
A. After demolishing or removal of any building from a parcel of land in the City, the house mover or owner of the parcel shall comply with the following conditions with respect to such parcel: 1. Securely cap and seal all gas, water, oil and any other utility pipes disconnected from the building; 2. Securely seal all sewer and other sanitary facilities; 3. Fill with sand or small gravel all excavations, including cesspools, septic tanks and wells; 4. Remove all refuse, debris, old foundations, walls, curbs, waste material and other impediments. Flat work concrete, level with surrounding ground, may remain. B. Within 20 days after removal of a building, the house mover or owner of the parcel shall file with the Building and Housing Department a letter certifying that all the provisions of this chapter have been complied with.
(Ord. 1851 § 1, 1979).
Ask a question about Chula Vista law
Corpus searches the Chula Vista sections it holds and shows the ones that match, with their citations. Free, no sign-in.
