§ 6.4.04 — Sewer extensions
Municipal Code, City of Clovis, California (code date 2026-08-17) · Clovis Municipal Code § 6.4.04
Corpus is an independent public-information project, not the official City of Clovis website. Stable reference: corpuslaw.us/code/303a4fce-22e5-4d10-941e-ae42357b8571
§ 6.4.04: Sewer extensions.
(a) Any person desiring to make an extension to the sanitary sewer system of the City to serve his property shall make a request in writing to the City Engineer for a preliminary investigation into the feasibility of such extension. If the extension as required is found to be feasible, such extension may be made to the sanitary sewer system of the City in accordance with the provisions of this section. The City shall inspect and may permit the final connection to the City system only if it is found that such extension conforms in all respects with the standard specifications for sanitary sewers within the City and with the sizes and grades designated by the City Engineer. (b) Any subdivider or other person installing a public sewer main, prior to the construction of the sewer, shall file with the City Engineer a legal description of the property which has contributed to the cost of construction, and a statement of the proportion of the cost borne by each property, and, within ninety (90) days following the completion of the main, shall file with the City Engineer a financial statement, in the form specified by the City Engineer, stating the cost (excluding any City reimbursement) of the construction of the main. In the event a financial statement has not been filed with the City Engineer within such period, then any refund pursuant to this section shall not be made in the event additional property is connected to the main constructed. If an ownership statement is not filed prior to construction, only the property served by the main, owned by the person who installed the main on the date of the commencement of installation, will be deemed to have paid for the installation; provided, however, if, within seven (7) years after the date of the commencement of installation, such person acquires in fee property served by the main which would otherwise be subject to the payment of front footage sewer charges, such person shall also be deemed to have paid the front footage sewer charges for such property. (c) For a period of twenty (20) years after the completion of a sewer main referred to in subsection (b) of this section, ninety (90%) percent of the front footage sewer charges collected by the City pursuant to this chapter for a connection to such sewer main shall be paid in proportion by the City to the owner or owners of property on behalf of which contributions were made to the cost of the construction of such sewer main or to their assignees; provided, however, the total refund shall not exceed one hundred percent (100%) of the cost of constructing sewer mains which do not front on any contributing property and fifty percent (50%) of the cost of constructing sewer mains, nor shall the total refund exceed the total amount of the front footage sewer charges which would have been payable by property on behalf of which no contribution was made to the cost of installation as of the date of the completion of the main. (d) When an extension is made by a subdivider or other person, they shall construct the sewer lines at the grades and sizes determined by the City Engineer and in accordance with City standard specifications, and, before making such installation, they shall pay to the City the oversize sewer charge on all property owned by the subdivider or other person installing the sewer system or contributing to the cost of sewers. The charge so payable shall be reduced by the difference in cost between an eight-inch (8") line at depths less than eight feet (8') and the cost of such larger sewer line at depths less than eight feet (8') as the subdivider or other person may have been required by the City Engineer to install. Such additional cost per lineal foot shall be determined as set forth in the Master Development Fee Schedule. When required to construct an eight-inch (8") sewer that provides service beyond the limits of the property owned by the subdivider or other person or when required to be constructed of a size larger than eight inches (8"), and at the average depth measured at adjacent manholes greater than eight feet (8') measured from the sewer flow line to the finished subgrade of the street or easements. Such additional cost per lineal foot shall be as set forth in the Master Development Fee Schedule. In the event the additional cost of constructing sewers exceeds the oversize sewer charge, the sum equal to the difference shall be paid from the Sewer Construction Fund to the subdivider or person installing the main upon the completion of the sewer. (e) If the construction of an off-site sewer is necessary in order to serve the property, such off-site sewer shall be built to the size and grade specified by the City Engineer. The additional cost of constructing a pipe in excess of eight inches (8") in diameter shall also be credited against the oversize sewer charge of the real property owned by the subdivider or person installing the sewer. If the extra cost of constructing the oversize sewer exceeds the oversize sewer charge payable by the subdivider or person installing the sewer, a sum equal to the difference shall be paid to him from the Sewer Construction Fund. (f) If a right-of-way is needed for the extension of the sewer, the subdivider or person installing the sewer shall obtain such right-of-way for the City or pay the cost to the City of acquiring such right-of-way. If the City Engineer determines that a pump station is necessary to serve the property of the subdivider or person installing the sewer, such subdivider or person shall install a pump station meeting specifications approved by the City Engineer and shall pay the full cost of such installation. (g) Whenever a sewer is extended to serve property, the sewer shall be extended across the full street frontage of the property to be served unless the City Engineer determines that such sewer shall not be further extended.
(§ 4, Ord. 328 ; as amended by § 2, Ord. 83-18 , eff. October 7, 1983 ; § 3, Ord. 93-19 , eff. August 18, 1993 ; § 5, Ord. 93-24 , eff. December 1, 1993 ; Ord. 96-20 , amended, December 18, 1996 ; § 8, Ord. 13-13 , eff. July 12, 2013 )
Ask a question about Clovis law
Corpus searches the Clovis sections it holds and shows the ones that match, with their citations. Free, no sign-in.