For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 6.6.03.1 — Supply well use requirements

Municipal Code, City of Clovis, California (code date 2026-08-17) · Clovis Municipal Code § 6.6.03.1

Corpus is an independent public-information project, not the official City of Clovis website. Stable reference: corpuslaw.us/code/59d1b420-9955-4137-b6ff-f08df19dbc0b

§ 6.6.03.1: Supply well use requirements.

(a) When private supply wells are approved for use by the City Engineer either for temporary or permanent use, except for existing water wells that are only deepened, a meter approved by the City Engineer shall be provided and installed by the applicant prior to use. The meter shall measure the total amount of water produced by the well. (b) The applicant shall be responsible for the maintenance of the meter. It shall be maintained in good repair and free from leakage. Failure to maintain said meter in good working order shall be cause for revocation of well permit. (c) Applicants for supply well utilization shall apply for service prior to well use in accordance with Section 6.5.102. (d) The applicant shall provide access to City personnel to inspect and read supply well meters. The City will cooperate with the customer to minimize the need for City personnel to have access to private property. Cooperative measures may include, but are not limited to, allowing the customer to provide meter readings to the City with periodic verification by City personnel, or by permitting the customer to provide a remote reading meter accessible to City personnel from a public right-of-way.

(§ 2, Ord. 93-2 eff. March 3, 1993 ; Ord. 96-20 , amended, 12/18/1996 ; § 4, Ord. 04-39 , eff. October 7, 2004 )

Ask a question about Clovis law

Corpus searches the Clovis sections it holds and shows the ones that match, with their citations. Free, no sign-in.