§ 7.5.01: Underground wiring.

All utility facilities (including, but not limited to, electrical, communication and cable television lines) located within the boundaries of a development project property or to be installed in and for the purpose of supplying service to any development project shall be placed underground. All existing overhead utilities that are included in the electrical utility undergrounding capital improvement inventory, established from time to time by Council resolution, shall be placed underground, except as follows: (a) Equipment appurtenant to underground facilities, such as surface-mounted transformers, pedestal-mounted terminal boxes, and meter cabinets and concealed ducts; (b) Metal poles supporting only streetlights; (c) Facilities used for the transmission of electric energy at nominal voltages of thirty-five thousand (35,000) volts or more; (d) If the topographical soil or any other conditions make underground installation of such facilities unreasonable or impractical, the Council may waive the requirements of this section; (e) Those existing overhead utility facilities that exist on the opposite side of a major street from the proposed development project, which may be relocated at the option of the developer. These exempt facilities do not include the existing overhead utility facilities that cross the major street; (f) Existing overhead utility facilities specifically located within the ultimate public right-of-way of major streets that are not included in the electrical utility undergrounding capital improvement established from time to time by Council resolution. The developer shall be responsible for compliance with the provisions of this section. It shall be the responsibility of the developer to make the necessary arrangements with the serving utility owner for the installation of an underground system, owned and operated by the utility owner. The developer shall submit satisfactory evidence thereof prior to the acceptance and approval of the development project.

(§ 1, Ord. 486 , eff. May 20, 1970 ; as amended by § 5, Ord. 96-10 , eff. July 1, 1996 ; § 7, Ord. 99-5 , eff. May 12, 1999 ; § 9, Ord. 10-19 , eff. January 7, 2011 ; § 12, Ord. 13-13 , eff. July 12, 2013 )

Ask a question about Clovis law

Corpus searches the Clovis sections it holds and shows the ones that match, with their citations. Free, no sign-in.