§ 8.1.01.1 — Amendments to Uniform Administrative Code
Municipal Code, City of Clovis, California (code date 2026-08-17) · Clovis Municipal Code § 8.1.01.1
Corpus is an independent public-information project, not the official City of Clovis website. Stable reference: corpuslaw.us/code/b6463f8a-8a25-4bc3-9f3c-75322775eeee
§ 8.1.01.1: Amendments to Uniform Administrative Code.
The Uniform Administrative Code adopted by reference by Section 8.1.01 of this Code is amended as follows: (a) Section 103, Definitions, is amended by changing the definition of the term “technical codes” to read as follows: TECHNICAL CODES refer to those codes adopted by this jurisdiction containing the provisions for design, construction, alteration, addition, repair, removal, demolition, use, location, occupancy and maintenance of buildings and structures and building service equipment as herein defined, including Clovis Municipal Code (Title 8), 1997 Uniform Codes, the current California Building Codes (Title 24) and Clovis Resolution No. 02-135 Storm Water PM-10 requirements. (b) The first paragraph of Section 303.4, Expiration, is amended to read as follows: 303.4 Expiration. Every permit issued by the building official under the provisions of the technical codes shall expire by limitation and become null and void, if the building or work authorized by such permit is not commenced within 180 days from the date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days. Failure to pass a required inspection every 180 days shall constitute the abandonment of work. Before such work can be recommenced, a new permit shall be first obtained to do so, and the fee therefore shall be one half the amount required for a new permit for such work, provided no changes have been made or will be made in the original plans and specifications for such work; and provided further, that such suspension or abandonment has not exceeded one year. In order to renew action on a permit after expiration, the permittee shall pay a new full permit fee. (c) The first paragraph of Section 304.2, Permit Fees, is amended to read as follows: 304.2 Permit Fees. The fee for each permit shall be as set forth in Tables B-1, E-1, M-1, P-1, S-1, and 3-G and 3-H, adopted by Ordinance and on file with the building official. The fees and fee calculation methodologies set forth in these Tables shall prevail over any conflicting fees or fee calculation methodologies set forth in any other adopted uniform code. Where a technical code has been adopted by the jurisdiction for which no fee schedule is shown in this code, the fee required shall be in accordance with the schedule established by the legislative body. (d) Section 304.3, Plan Review Fees, is amended to read as follows: 304.3 Plan Review Fees. When submittal documents are required by Section 302.2, a plan review fee shall be paid at the time of submitting the submittal documents for plan review. Said plan review fee shall be 65 percent of the building permit fee as shown in Table B-1. The plan review fees for electrical, mechanical and plumbing work shall be equal to 25 percent of the total permit fee as set forth in Tables E-1, M-1 and P-1. The plan review fee for grading work shall be as set forth in Table 3-G. The plan review fees for Seismic, Disabled Access, and California Building Energy Efficiency Standards, shall be 25 percent of the Building Plan Check fee for each area when detailed as shown in Table B-1. The plan review fees specified in this section are separate fees from the permit fees specified in Section 304.2 and are in addition to the permit fees. When submittal documents are incomplete or changed so as to require additional plan review or when the project involves deferred submittal items as defined in Section 302.4.2, an additional plan review fee shall be charged at the rate shown in Tables B-1, E-1, M-1, P-1, and 3-G. (e) The first three paragraphs of Section 304.5.2, Fee, are amended to read as follows: 304.5.2 Fee. An investigation fee, in addition to the permit fee, shall be collected whether or not a permit is then or subsequently issued. The investigation fee shall be equal to the amount of the permit fee required by this code. The minimum investigation fee shall be the same as the minimum fee set forth in Tables B-1, E-1, M-1, P-1, 3-G and 3-H. Subsequent un-permitted work by the same permittee shall result in a progressive investigation fee being accessed, second violation would result in a three times the permit fee for the investigation fee, a third violation would result in a four times the permit fee for the investigation fee, a fourth violation would result in a five times the permit fee for the investigation fee, and so on to a maximum of a ten times the permit fee for the investigation fee. The payment of such investigation fee shall not exempt an applicant from compliance with all other provisions of either this code or the technical codes nor from the penalty prescribed by law. Swimming Pool Safety Barriers not finaled prior to pool water placement are subject to an investigation fee. (f) Section 305.5, Required Building Inspections, is amended to read as follows: 305.5 Required Building Inspections. Reinforcing steel or structural framework or a part of a building or structure shall not be covered or concealed without first obtaining the approval of the building official. Protection of joints and penetrations in fire-resistive assemblies shall not be concealed from view until inspected and approved. The building official, upon notification, shall make the following inspections: 1. | Foundation inspection. To be made after excavations for footings are complete and required reinforcing steel is in place. For concrete foundations, required forms shall be in place prior to inspection. All materials for the foundation shall be on the job, except when concrete is ready-mixed in accordance with approved nationally recognized standards, the concrete need not be on the job. When the foundation is to be constructed of approved treated wood, additional inspections may be required by the building official. 2. | Concrete slab or under-floor inspection. To be made after in-slab or under-floor building service equipment, conduit, piping accessories and other ancillary equipment items are in place but before any concrete is placed or floor sheathing installed, including the subfloor. 3. | Frame inspection. To be made after the roof, framing, fire blocking and bracing are in place and all pipes, chimneys and vents are complete and the rough electrical, plumbing, and heating wires, pipes, and ducts are approved. 4. | Lath and/or wallboard inspection. To be made after lathing and wallboard, interior and exterior, is in place but before plaster is applied or before wallboard joints and fasteners are taped and finished. 5. | Other inspections. All inspections listed in section 109 of the International Building Code or the latest version of the California Building Code. 6. | Final inspection. To be made after finish grading and the building is completed and ready for occupancy. (g) Section 309.1, Use or Occupancy, is amended to read as follows: 309.1 Use or Occupancy. Buildings or structures shall not be used or occupied nor shall a change in the existing occupancy classification of a building or structure or portion thereof be made until the building official has issued a certificate of occupancy therefor as provided herein. Issuance of a certificate of occupancy shall not be construed as an approval of a violation of the provisions of this code or of other ordinances of the jurisdiction. Certificates presuming to give authority to violate or cancel the provisions of this code or of other ordinances of the jurisdiction shall not be valid. (h) Section 309.3, Certificate Issued, is amended to read as follows: 309.3 Certificate Issued. After the building official inspects the building or structure and finds no violations of the provisions of this code or other laws which are enforced by the code enforcement agency, the building official shall issue a certificate of occupancy which shall contain the following: 1. | The building permit number. 2. | The address of the building. 3. | The name and address of the owner. 4. | A description of that portion of the building for which the certificate is issued. 5. | A statement that the described portion of the building has been inspected for compliance with the requirements of this code for the group and division of occupancy and the use for which the proposed occupancy is classified. 6. | The name of the building official. 7. | The edition of the code under which the permit was issued. 8. | The design occupant load. (i) Table 3.1 is added for the purpose of collecting fees to fund the implementation of the Clovis Planning Program and the information management system for building activities: Table 3.1 reads as follows: I. | A fee as set forth by resolution of the City Council shall be charged for all building permits for the purposes of funding the City of Clovis Planning Program. J. | A fee of twenty dollars ($20.00) per permit for all permit transactions shall be charged. This fee shall be collected for the exclusive use of improving the Information Management System and the transferring of legacy files into that system.
(§ 2, Ord. 88-12 , eff. July 6, 1988 ; as amended by § 2, Ord. 90-2 , eff. March 22, 1990 ; § 1, Ord. 90-48 , eff. January 16, 1991 ; § 2, Ord. 93-6 , eff. May 5, 1993 ; § 1, Ord. 94-16 , eff. June 1, 1994 ; § 1, Ord. 94-31 , eff. November 16, 1994 ; Ord. 97-28 , eff. March 9, 1998 to March 4, 2001 ; § 1, Ord. 01-09 , eff. April 11, 2001 to March 12, 2006 ; § 1, Ord. 06-02 , eff. March 15, 2006 to February 13, 2011 ; § 1, Ord. 07-11 , eff. April 4, 2007 ; § 1, Ord. 07-31 , eff. November 7, 2007 ; § 1, Ord. 08-15 , eff. August 20, 2008 ; § 3, Ord. 08-22 , eff. November 19, 2008 ; § 1, Ord. 23-02 , eff. June 14, 2023 )
Ask a question about Clovis law
Corpus searches the Clovis sections it holds and shows the ones that match, with their citations. Free, no sign-in.
