§ 8.11.04 — Temporary utilities permits
Municipal Code, City of Clovis, California (code date 2026-08-17) · Clovis Municipal Code § 8.11.04
Corpus is an independent public-information project, not the official City of Clovis website. Stable reference: corpuslaw.us/code/1624dec6-e620-42be-b395-da826434c98b
§ 8.11.04: Temporary utilities permits.
A temporary utilities permit may be issued at the discretion of the Building Official. The owner, contractor, or building permit holder(s) shall not occupy a structure that has been granted a temporary utilities permit until such time as all final inspections are complete and a certificate of occupancy has been issued for the building. A temporary utilities permit is issued upon the execution of a Temporary Utilities Agreement and is required for each utility meter set issued. Family Dwellings. A deposit of five hundred and no/100ths dollars ($500.00) per one thousand five hundred (1,500) square feet of building space, or portion thereof, shall be required for each temporary gas meter issued during the months of November through February. The deposit for a single building shall not exceed six thousand and no/100ths dollars ($6,000.00). Such deposit(s) shall be refundable after final inspections are complete and the certificate of occupancy is issued for the building. A non-refundable processing fee of one hundred twenty-five and no/100ths dollars ($125.00) is required for each temporary gas meter issued. If the building is occupied before the certificate of occupancy is issued, the temporary utilities permit shall be void and the deposit forfeited. Temporary gas meter sets for one and two family dwellings and multifamily dwelling may not be obtained during the months of March through October. Other Occupancies. Temporary gas and electric meter sets for all other occupancies require a deposit of five hundred and no/100ths dollars ($500.00) per one thousand five hundred (1,500) square feet of building space, or portion thereof. The deposit for a single building shall not exceed six thousand and no/100ths dollars ($6,000.00). Such deposit(s) shall be refundable after final inspections are complete and the certificate of occupancy is issued for the building. A nonrefundable processing fee of one hundred twenty-five and no/100ths dollars ($125.00) is required for each temporary gas or electric meter issued. If the building is occupied before the certificate of occupancy is issued, the temporary utilities permit shall be void and the deposit forfeited.
(§ 1, Ord. 77-32 , eff. August 4, 1977 , as amended by § 22, Ord. 88-12 , eff. July 6, 1988 , and § 1, Ord. 02-05 , eff. March 13, 2002 ; § 1, Ord. 09-14 , eff. August 6, 2009 )
Ask a question about Clovis law
Corpus searches the Clovis sections it holds and shows the ones that match, with their citations. Free, no sign-in.
