§ 9.112.030 — Installation of improvements

Municipal Code, City of Clovis, California (code date 2026-08-17) · Clovis Municipal Code § 9.112.030

Corpus is an independent public-information project, not the official City of Clovis website. Stable reference: corpuslaw.us/code/b574cfa3-9589-42eb-ab5a-a3df44ddaa21

§ 9.112.030: Installation of improvements.

Subdivision improvements required as conditions of approval of a tentative map approved in compliance with this chapter (see Section 9.102.060) shall be installed as specified by this section. A. Timing of improvements. Required improvements shall be constructed or otherwise installed only after the approval of improvement plans in compliance with Section 9.112.020, and before the approval of a parcel or final map in compliance with Section 9.104.060 (Parcel map approval) or 9.104.100 (Final map approval), except where: 1. Improvements are deferred in compliance with Section 9.112.040 (Improvement agreements and security); or 2. Improvements are required as conditions on the approval of a subdivision of four (4) or fewer parcels, in which case construction of the improvements shall be required: a. When a building permit is issued for development of an affected parcel; b. At the time the construction of the improvements is required in compliance with an agreement between the subdivider and the City, as specified in Section 9.112.040 (Improvement agreements and security); or c. At the time specified in a condition of approval, when the review authority finds that fulfillment of the construction requirements by that time is necessary for public health and safety, or because the required construction is a necessary prerequisite to the orderly development of the surrounding area; or 3. Under other circumstances as approved by the City Engineer; 4. To avoid breaking up street paving, underground utility or service lines required to be installed as part of a subdivision and which are planned to run across or underneath a street or alley right-of-way shall be installed before the preparation of subgrade and before the surfacing of any streets or alleys. In the event that the development of the subdivision requires the utility company to perform utility construction work, the subdivider shall pay a deposit satisfactory to the utility company within sufficient time to allow construction work to be performed before subgrade preparation. In no event shall subgrade preparation commence before installation of all necessary utilities and laterals. B. Inspection of improvements. The inspection of the construction and installation of required subdivision improvements shall occur as follows: 1. Supervision. Before starting any work, the contractor engaged by the subdivider shall designate in writing an authorized representative who shall have the authority to represent and act for the contractor in contacts with the City. The designated representative shall be present at the work site at all times while work is in progress. At times when work is suspended, arrangements acceptable to the City Engineer shall be made for any emergency work that may be required. 2. Inspection procedures. a. Inspections required. The agency that has required a specific action shall make any inspections as it deems necessary to ensure that all construction complies with the approved improvement plans. Where required by the agency, the subdivider shall enter into an agreement with the City to pay the full cost of any contract inspection services determined to be necessary by that agency. b. Access to site and materials. The agency that has required a specific action shall have access to the work site at all times during construction, and shall be furnished with every reasonable facility for verifying that the materials and workmanship are in compliance with the approved improvement plans. c. Authority for approval. The work done and all materials furnished shall be subject to the inspection and approval of the agency that has required a specific action. The inspection of the work or materials shall not relieve the contractor of any obligations to fulfill the work as prescribed. d. Improper work or materials. Work or materials not meeting the requirements of the approved plans and specifications may be rejected, regardless of whether the work or materials were previously inspected by the agency that has required a specific action. In the event that the agency determines that subdivision improvements are not being constructed as required by the approved plans and specifications, it shall order the work stopped and shall inform the contractor of the reasons for stopping work and the corrective measures necessary to resume the work. Any work done after issuance of a stop work order shall be a violation of this chapter. 3. Notification. The subdivider shall notify the City Engineer as part of condition compliance upon the completion of each stage of construction before recordation as specified in this chapter. Further construction may only be completed if all required actions included in the conditions of approval have been accomplished and signed off by the agency that has required the action(s).

(§ 2, Ord. 14-13 , eff. October 8, 2014 )

Ask a question about Clovis law

Corpus searches the Clovis sections it holds and shows the ones that match, with their citations. Free, no sign-in.