§ 9.42.070 — Review and approval

Municipal Code, City of Clovis, California (code date 2026-08-17) · Clovis Municipal Code § 9.42.070

Corpus is an independent public-information project, not the official City of Clovis website. Stable reference: corpuslaw.us/code/e7e3410d-a8b4-4759-9373-7f86ea8700b5

§ 9.42.070: Review and approval.

A. Findings. Approval of wireless telecommu-nication facilities identified in Section 9.42.030 (Standards for all wireless telecommunication facilities) and allowed by this chapter shall require that the following findings be made in addition to any other findings required by this Development Code or the Municipal Code. The applicable review authority shall first determine that: 1. There is adequate space on the property for the antenna and accessory wireless equipment without conflict with existing structures on the property, or reducing required landscaping, parking, or other development standards; 2. The design and placement of the antenna and accessory wireless equipment will not adversely impact the use of the property, other structures located on the property, or the surrounding area or neighborhood; 3. The antenna and accessory wireless equipment as proposed are consistent with the intent of this chapter and comply with the general standards for wireless telecommunication facilities and any special conditions identified below; and 4. The public right-of-way will not be adversely impacted. B. Conditions of approval. Conditions of approval shall be imposed on any permit and/or approval granted in compliance with this chapter. Permits shall not become effective until all applicable conditions of approval have been met. All conditions of approval shall be observed throughout the duration of the permit. Conditions shall include, but shall not be limited to, the following: 1. Indemnification. The applicant shall agree to indemnify, hold harmless, and defend the City, its officers, agents, and employees from any and all liability or claims that may be brought against the City from its approval of the permit. 2. Terms of lease. a. A letter outlining the terms of the lease, license, or other agreement with the property owner shall be submitted to the City before issuance of a building permit for the facility. b. If the lease, license, or agreement is extended or terminated, notice and evidence thereof shall be provided to the Director. c. Upon termination of the lease, license, or agreement, the permit for the facility shall become void and the facility and all related equipment removed within ninety (90) days. 3. Certificate of continued use. a. Certificate of continued use for each approved facility shall be submitted on a yearly basis for as long as the facility remains in operation. b. The certification shall indicate that the facility is operating as approved and that the facility complies with the most current Federal Communications Commission (FCC) safety standards. c. Facilities which are no longer in operation shall be removed within ninety (90) days after the date of discontinuation. 4. Revocation. If no annual certification is provided, the permit for the facility may be revoked by the Director. Before revoking the permit, the Director shall provide the owners of record written notice of their failure to provide the annual certification and an opportunity for a hearing. 5. Security. Before issuance of a building permit or encroachment permit for the facility, the applicant shall be required to provide a bond or other acceptable form of security with the City to guarantee the removal of the facility and any accessory wireless equipment if the facility is found to be abandoned, the permit is revoked by the Director, or the facility is found in need of repair or graffiti abatement and reasonable notice and an opportunity to correct has been provided. 6. Change of ownership. Written notice of a change of ownership of the facility shall be provided to the Director within thirty (30) days of the change. 7. Preliminary engineering report. Within ninety (90) days of commencement of operation, the applicant shall provide a preliminary report and/or field report prepared by a qualified engineer that shows the operation of the facility is in compliance with the standards established by the American National Standards Institute (ANSI) and Institute of Electrical and Electrical Engineers (IEEE) for safe human exposure to electromagnetic fields (EMF) and radio frequency radiation (RFR). 8. Changes and modifications. All changes and modifications to an approved facility shall require prior approval by the City. 9. Vandalism repair. All graffiti and other forms of vandalism shall be promptly removed and/or repaired within twenty-four (24) hours.

(§ 2, Ord. 14-13 , eff. October 8, 2014 )