§ 12.15.055 — Street cut moratorium
Concord Municipal Code (Current through Ordinance 26-2, passed September 8, 2026) · Concord Municipal Code § 12.15.055
Corpus is an independent public-information project, not the official City of Concord website. Stable reference: corpuslaw.us/code/726efee4-d66e-424c-9e01-4c8c04d0e7ca
12.15.055 Street cut moratorium.
(a) Temporary moratorium after paving, construction, or reconstruction of public streets. On any paved, constructed or reconstructed public street, the pavement surface shall not be cut or otherwise opened for any encroachment for a five-year period after such pavement, construction or reconstruction is completed. On a slurry sealed street, the pavement surface shall not be cut or otherwise opened for any encroachment for a two-year period after such pavement, construction or reconstruction is completed. (b) Exceptions. Upon a written request by an applicant, the City Engineer may grant an exception to the moratorium imposed on any public street under this section based a determination by the City Engineer of any of the following: (1) For emergencies that endanger life or property; (2) For work necessary to prevent essential utility service interruptions or restore such services after an interruption; (3) For any work mandated by any federal, state or city legislation; (4) For situations in which the applicant has no other feasible means to provide utility service to a building; or (5) For any other situation in which the City Engineer deems an exception to be in the city’s and the residents’ best interests. (c) Conditions may be imposed. The City Engineer may impose conditions on any exception granted under this section that, in the City Engineer’s determination, are necessary or appropriate to rapidly and completely restore the street and/or pavement surface, which may include, without limitation, base and sub-base repairs, curb replacement and/or restoration, repainting and/or restoring street markings and repaving the street over its full width and/or to any other natural breakpoint in the pavement surface. All such restoration work shall be: (1) performed at the applicant’s sole cost and expense; (2) performed in accordance with all applicable provisions in Title 12 and the city’s standard specifications for public improvements; and (3) completed within 90 days after the applicant completes the work for which the exception was granted. (Ord. No. 22-8 § 6 (Exh. A))
Ask a question about Concord law
Corpus searches the Concord sections it holds and shows the ones that match, with their citations. Free, no sign-in.
