For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 15.55.030 — Permit required

Concord Municipal Code (Current through Ordinance 26-2, passed September 8, 2026) · Concord Municipal Code § 15.55.030

Corpus is an independent public-information project, not the official City of Concord website. Stable reference: corpuslaw.us/code/68b821b6-83b0-4da2-a925-3d10c13e1cf3

15.55.030 Permit required.

(a) A permit shall be obtained prior to any construction on structures identified as unreinforced masonry buildings, as defined by the Existing Building Code for the City of Concord. (b) Persons preparing plans and engineering calculations shall be licensed by the state as either a civil or structural engineer. The license shall be kept current throughout the term of reconstruction, until the certificate of occupancy is issued. The design engineer shall be termed the “engineer of record.” A change of engineer during the reconstruction shall be preceded by documentation from the new “engineer of record,” accepting design responsibility from the date he assumes responsibility. There shall be no voids between responsible engineers. (Code 1965, § 9903; Code 2002, § 14-433. Ord. No. 11; Ord. No. 91-8; Ord. No. 07-13; Ord. No. 16-7, § 13)

Ask a question about Concord law

Corpus searches the Concord sections it holds and shows the ones that match, with their citations. Free, no sign-in.