§ 18.310.050 — General requirements for the tree protection zone (TPZ)

Concord Municipal Code (Current through Ordinance 26-2, passed September 8, 2026) · Concord Municipal Code § 18.310.050

Corpus is an independent public-information project, not the official City of Concord website. Stable reference: corpuslaw.us/code/b52e0236-5a7b-4b8a-b9c4-c44627c0b5a7

18.310.050 General requirements for the tree protection zone (TPZ).

The following procedures shall apply to all encroachments in the tree protection zone (TPZ) associated with development and construction activities. All tree permits related to such activities shall incorporate the provisions of this chapter unless otherwise recommended by the arborist and approved by the planning division and/or public works department. A. Trenching Procedures. Trenching within the TPZ, when permitted, shall only be conducted with hand tools, or use of an air spade, or as otherwise directed by an arborist, to avoid root injury. B. Cutting Roots. 1. Minor roots less than one inch in diameter may be cut, but damaged roots shall be traced back and cleanly cut behind any split, cracked or damaged area. 2. Major roots over one inch in diameter may not be cut without approval of an arborist. Depending upon the type of improvement being proposed, bridging techniques or a new site design may need to be employed to protect the root and the tree. C. Ground Surface Fabric. If any ground surface fabric within the TPZ is removed for any reason, it shall be replaced within 48 hours. D. Irrigation Systems. An independent low flow drip irrigation system may be required for establishing drought-tolerant plants within the TPZ. Irrigation shall be gradually reduced and discontinued over a two-year period. E. Plant Material Under Oaks. Planting live material under native oak trees is generally discouraged, and will not be permitted within six feet of a trunk of a native oak tree with a diameter of 18 inches or less at 54 inches above ground, or within 10 feet of a trunk with a diameter of more than 18 inches at 54 inches above ground. Only drought-tolerant plants will be permitted within the protected zone of native oak trees. F. Temporary Protective Fencing During Construction or Grading Activities. 1. Type of Fencing. Prior to construction or grading activities, a minimum five-foot-high chain link or substitute fence shall be installed at the outermost edge of the TPZ for each protected tree or groups of protected trees. Exceptions to this policy may occur in cases where protected trees are located on slopes that will not be graded. Approval shall be obtained from the planning division prior to omitting fences in any area of the project. 2. Fence Installation. Temporary fences shall be installed in accordance with an approved fencing plan prior to the commencement of any grading operations or other such time as determined by the review authority. 3. Signing. Signs shall be installed on the fence in four equidistant locations around each TPZ. The size of each sign shall be a minimum of two feet by two feet and shall contain the following language: “WARNING: THIS FENCE SHALL NOT BE REMOVED OR RELOCATED WITHOUT WRITTEN AUTHORIZATION FROM THE CONCORD PLANNING DIVISION” Signs placed on fencing around a grove of protected trees shall be placed at approximately 50-foot intervals. 4. Fence Removal. Fences shall remain in place throughout the entire construction period and shall be removed at the end of construction. G. Retaining Walls and Root Protection. Where a building permit has been approved for construction of a retaining wall within the TPZ, the applicant shall provide for the immediate protection of exposed roots from moisture loss during the time prior to the completion of the wall. The retaining wall shall be constructed within 72 hours after completion of grading. H. Preservation Devices. If required, preservation devices such as aeration systems, tree wells, drains, special foundation systems, special paving, and cabling systems must be installed per approved plans and certified by an arborist. I. Grading. 1. Every effort shall be made to avoid cut and/or fill slopes within or in the vicinity of the TPZ. 2. No grade changes are permitted which cause water to drain to within twice the longest radius of the TPZ. 3. No grade changes are permitted that will lower the ground on all sides of the TPZ. J. Chimney Locations. A chimney for a wood-burning fireplace or stove shall not be located within or beneath the canopy of a tree or in a location where sparks emitted from the chimney may damage a tree. K. Certification Letters. Certification letters shall be required for all regulated activities within the TPZ. The arborist shall be required to submit a certification letter to the planning division within five working days of completing any regulated activity, attesting that all work was conducted in accordance with the appropriate permits and the requirements of this chapter. L. On-Site Information. The following information shall be posted on site during any construction activity within the TPZ: 1. Arborist’s report and any subsequent modifications; 2. Tree location map with a copy of the tree fencing plan; 3. Tree permit; 4. Approved construction plans; 5. Tree preservation guidelines; and 6. Approved planting and irrigation drawings. M. Information Standards. The applicant shall be responsible for informing all subcontractors and individuals who will be performing work around protected trees of the requirements of this section and the conditions of approval for the project. This information shall be provided in writing to the subcontractors and employees by the general contractor or applicant. N. Utility Trenching Pathway Plan. As a condition of the tree permit, the applicant shall be required to submit a utility trenching plan with the improvement or civil plans, prior to issuance of permits. 1. Contents. The trenching pathway plan shall depict all of the following systems: storm drains, sewers, easements, water mains, area drains, and underground utilities. Except in lot sale subdivisions, the trenching pathway plan must show all lateral lines serving the buildings. The trenching pathway plan must include the surveyed locations of all protected trees as well as an accurate plotting of the TPZ. 2. Standards for Plan. The trenching pathway plan shall consider the following guidelines: a. The trenching pathway plan shall be developed to avoid encroaching into the TPZ on its path from the street to the building. b. Where it is not possible to avoid encroachment, the design shall minimize the extent of such encroachment. Encroachments and mitigation measures shall be addressed in a supplemental arborist’s report. O. Final Certification of Tree Work. All of the tree preservation measures required by the conditions of approval and the arborist reports shall be completed and certified by the arborist prior to issuance of an occupancy permit. P. Pruning. Pruning of trees that are retained shall be conducted in compliance with International Society of Arboriculture (ISA) best management practices and ANSI A300 or other applicable and comparable accepted standard. [Ord. 12-4. DC 2012 § 122-829].

Ask a question about Concord law

Corpus searches the Concord sections it holds and shows the ones that match, with their citations. Free, no sign-in.