§ 18.415.060 — Design review board
Concord Municipal Code (Current through Ordinance 26-2, passed September 8, 2026) · Concord Municipal Code § 18.415.060
Corpus is an independent public-information project, not the official City of Concord website. Stable reference: corpuslaw.us/code/631c97c1-4732-407c-86c3-24638ad81299
18.415.060 Design review board.
This section describes the process for projects that are reviewed by the design review board (DRB). The DRB has the authority to revise this procedure as necessary in order to facilitate the resolution of project issues and to avoid unnecessary hearings. Alternative procedures could include consideration and approval of projects in a single meeting, holding a single or multiple study sessions, or appointing a two-person subcommittee to work with the project design team outside of the regularly scheduled DRB meetings. When an alternative procedure is used, the project recommendation shall require final action by the full DRB at a regular DRB meeting. A. Conceptual Design and Site Review. Conceptual design and site review is a part of the preliminary application review process. When required or requested, this process provides general comments and direction to applicants prior to submitting a formal application. Plans are not expected to be complete or fully detailed. The board provides comments on the design concept, massing, bulk, site plan layout and function, building orientation, preliminary elevations and architectural style, adequacy of landscaped areas and site amenities, and the integration of stormwater requirements into the site design. B. Preliminary Design and Site Review. Preliminary design and site review is scheduled after a formal application has been submitted with detailed project plans that are either complete or nearly complete, as follows: 1. Staff reviews projects that have been through conceptual design and site review for conformance with the board’s initial comments; 2. Staff reviews new projects for compliance with the development code and any applicable design guidelines and provides a recommendation to the board; 3. If the board’s recommendations require a significant alteration to the plans or a significant project redesign, a subsequent preliminary design and site review meeting will be required; 4. When the board is generally satisfied with the project design but needs additional plans or details to verify the project design, the board recommends resubmittal of plans for final design and site review approval; and 5. When a project scheduled for preliminary design and site review has incorporated the board’s comments from conceptual design and site review, and complete plans have been submitted, the board may approve the project without an additional meeting for final design and site review. C. Preliminary/Final Design and Site Review. A project scheduled for preliminary design and site review may be approved without a subsequent final design review hearing, if: 1. All of the project details required in the application checklist for final design and site review have been submitted; and 2. The board has only minor comments which will not affect the overall design of the project nor require further review. D. Final Design and Site Review. Final design and site review is a review of plans submitted in response to comments made by the DRB at preliminary design and site review and typically includes additional project details. If the board is satisfied that the project plans meet the applicable design and site review criteria, the board “recommends approval” to the applicable review authority. The board may make their recommendation with or without conditions of approval. [Ord. 23-7 § 9 (Exh. B); Ord. 13-5; Ord. 12-4. DC 2012 § 122-906].
Ask a question about Concord law
Corpus searches the Concord sections it holds and shows the ones that match, with their citations. Free, no sign-in.
