§ 3.10.030 — Public projects – Delegations of authority and generally applicable requirements

Concord Municipal Code (Current through Ordinance 26-2, passed September 8, 2026) · Concord Municipal Code § 3.10.030

Corpus is an independent public-information project, not the official City of Concord website. Stable reference: corpuslaw.us/code/e472984d-eca1-4367-b127-5ee5614e0e3a

3.10.030 Public projects – Delegations of authority and generally applicable requirements.

Public projects shall be let to contract utilizing those procedures (formal, informal, or negotiated contract/force account) set forth in the Public Contract Code, and more specifically UPCCAA as applicable, based on those monetary limits set forth in Public Contract Code Section 22032, as amended from time to time. The city shall utilize UPCCAA’s procedures unless and until Council adopts a resolution suspending the city’s participation in UPCCAA and notifies the UPCCAA Commission of that decision. (a) Delegations of authority. (1) Bid documents. The City Engineer and City Manager are each independently vested with the authority to adopt plans, specifications, and working details for all public projects, which shall include the authority to modify any plans, specifications, and working details initially approved by Council. (2) Submittal of bids. Informal bids shall be submitted at the time and place prescribed in the bidding notice. If bids are submitted electronically, the system shall comply with Public Contract Code Section 1601. The City Clerk shall retain submitted bid bonds, cash or cashier’s checks in lieu of a bid bond. (3) Award of informally bid contracts. The City Manager is authorized to award and execute informal contracts as defined in Public Contract Code Section 22032 to the lowest responsible bidder. (4) Execution of agreements. The City Manager may execute all agreements associated with public projects within the authorities delegated by this chapter or approved directly by Council. (5) Rejection of bids; resolicitation; use of city employees. The city shall follow those procedures set forth in Public Contract Code Section 22038 for the rejection of bids. The City Manager is authorized to reject all bids received in response to a bid process. After rejecting the bids, which shall include written notice to all bidders, the City Manager may: a. Abandon the project; b. Readvertise the project; or c. Perform the work with city employees, after adoption of a resolution by a four-fifths majority vote of the Council declaring that the project can be performed more economically by city employees. (6) No bids. If no bids are received through the formal or informal bid process, the project may be performed by the employees of the city by force account, or negotiated contract, with award of any contract in excess of the informal bid limit to be approved by the Council. (7) Recording notices. The City Engineer shall have the authority to record a notice of completion or notice of cessation in connection with any public project. (b) Informal bidding. Public projects, as defined by UPCCAA and within the dollar thresholds listed in California Public Contract Code Section 22032, as amended from time to time, may be let to contract by informal procedures as set forth in Section 22032 et seq. of the Public Contract Code. (1) Notice inviting informal bids. When a public project which is anticipated to fall within the monetary limits of informal bids described in Public Contract Code Section 22032 (as amended from time to time) is to be performed, the city shall prepare a notice of the opportunity to bid which describes the project in general terms, states the time and place for the submission of bids, and describes how to obtain more detailed information about the project. The city shall notify all construction trade journals as specified by the Commission in accordance with Public Contract Code Section 22036. Other contractors and/or construction trade journals may also be notified at the discretion of the department soliciting bids. Notification shall be completed at least 10 days before bids are due. (2) Bids exceeding informal bidding limit. If all informal bids received exceed the monetary limits prescribed for informal bids as described in Public Contract Code Section 22032 (as amended from time to time by the Commission) and the city determines that the cost estimate was reasonable, the city may award the contract at up to the limit described in Public Contract Code Section 22034(d), by a resolution approved by a four-fifths vote of the Council. (c) Formal bidding. The formal bidding procedures for public projects shall comply with all aspects of state and local law. (1) Notice inviting formal bids. When a public project which is anticipated to exceed the monetary limits for informal bidding described in Public Contract Code Section 22032 (as amended from time to time by the Commission) is to be performed, the city shall comply with those procedures set forth in Public Contract Code Section 22037. (2) Plans and specifications. Formal bids shall include plans and specifications documenting the work to be completed. (d) Emergency procedures. When an emergency necessitates repair or replacement, contracts shall be awarded pursuant to the procedures described in Public Contract Code Sections 22035 and 22050. If federal funds are to be utilized or reimbursement will be sought from the federal government in connection with the public project, city staff shall consult and work to comply with applicable federal procurement requirements (e.g., Title 2 of the Code of Federal Regulations, Part 200; FEMA Public Assistance Program and Policy Guide) as appropriate to facilitate maximum financial recovery by the city. (e) Force account work, including the use of the city’s own forces (CUPCCAA). Whenever the city uses its own employees to perform a public project because the work is either below the informal bid thresholds or pursuant to a determination by the City Council under Public Contract Code Section 22038(a)(2), city staff shall implement the Uniform Construction Cost Accounting Policies and Procedures described in Public Contract Code Section 22042 et seq. and the Commission’s policies and procedures manual. (f) Design-build. Pursuant to Public Contract Code Section 22160 et seq. the Council may approve the use of the design-build method for public projects in excess of $1,000,000 with contract award either to the low bid, the best value, or in any other situations that may be authorized by state law. As required by Public Contract Code Section 22162, a design professional or other consultant, who, under contract with the city, provides assistance related to the design-build procurement, including but not limited to preparing the documents for solicitation shall be prohibited from participating with the design-build entity or team. (g) Contracts for maintenance and other work. Contracts solely for maintenance work, as defined by Public Contract Code Section 22002(d), do not constitute public projects, but may be bid pursuant to any bidding procedures described in this chapter, obtained by any other procurement method determined by the Purchasing Officer including, but not limited to, requests for proposals or direct contracting, or be performed by force account. (Ord. No. 26-2, § 6 (Exh. A))

Prior legislation: Code 1965, §§ 2311 through 2316; Code 2002, §§ 2-641 through 2-649; Ord. Nos. 1001, 89-8, 92-9, 98-3, 07-4 and 11-9.