15.26.060 - Plan review, permit, and inspection requirements.
The building division shall provide an administrative, nondiscretionary plan check review process to expedite approval of small residential rooftop solar energy systems within thirty days of the adoption of this chapter. The building division shall process, review, and approve the application for the installation or use of a solar system in the same manner as an application for review of an architectural modification to the property, and shall not be willfully avoided or delayed. If an application is deemed incomplete, a written correction notice detailing all deficiencies in the application and any additional information or documentation required to be eligible for expedited permit issuance shall be sent to the applicant for resubmission. If an application for the installation of a solar system is not denied in writing within forty-five days of receipt of a complete application the application shall be deemed approved, unless the delay is the result of a reasonable request for additional information. The City of Daly City Planning Division may require an applicant to apply for a use permit if the planning division finds, based on substantial evidence, that the solar energy system could have a specific, adverse impact upon the public health and safety. Such decisions may be appealed to City of Daly City Planning Commission. Review of the permit application shall be limited to the building division's review of whether the application meets local, state, and federal health and safety requirements. If a use permit is required, the building official may deny an application for the use permit if the building official makes written findings based upon substantive evidence in the record that the proposed installation would have a specific, adverse impact upon public health or safety and there is no feasible method to satisfactorily mitigate or avoid, as defined, the adverse impact. Such findings shall include the basis for the rejection of the potential feasible alternative for preventing the adverse impact. Such decisions may be appealed to the City of Daly City Planning Commission. Any condition imposed on an application shall be designed to mitigate the specific, adverse impact upon health and safety at the lowest possible cost. A "feasible method to satisfactorily mitigate or avoid the specific, adverse impact" includes, but is not limited to, any cost-effective method, condition, or mitigation imposed by the City of Daly City on another similarly situated application in a prior successful application for a permit. The City of Daly City shall use its best efforts to ensure that the selected method, condition, or mitigation meets the conditions of subparagraphs (A) and (B) of paragraph (1) of subdivision (d) of Section 714 of the Civil Code defining restrictions that do not significantly increase the cost of the system or decrease its efficiency or specified performance. The City of Daly City shall not condition approval of an application for a small residential rooftop solar energy system on the approval of an association, as defined in Section 4080 of the Civil Code. Only one inspection shall be required and performed by the building division for small residential rooftop solar energy systems eligible for expedited review. During the required inspection, if is found that the installation does not conform to the approved plans and/or comply with the current California Code of Regulations title 24 requirements then an additional, follow-up inspection shall be required. If a small residential rooftop solar energy system fails inspection, a subsequent inspection is authorized and required but need not conform to the requirements of this chapter. A separate fire inspection may be performed by the North County Fire Department, if required. The inspection shall be done within three business days and may include consolidated inspections.
(Ord. No. 1393, § 1, 8-10-2015)