§ 16.20.040 — Additional requirements for final map
Municipal Code of the City of Daly City, California (Codified through Ordinance No. 1492, passed June 8, 2026 (Supp. No. 39)) · Daly City Municipal Code § 16.20.040
Corpus is an independent public-information project, not the official City of Daly City website. Stable reference: corpuslaw.us/code/5a368b52-0d55-48d9-aa59-a6031d29e787
16.20.040 - Additional requirements for final map.
In addition to the other provisions of this title, the final map shall be prepared in full compliance with the following requirements: A. The final map shall show the line of high water in case the subdivision is adjacent to a stream, channel, or any body of water, and shall also show any area subject to periodic inundation by water. B. Lot numbers shall begin with the Arabic numeral "1" and continue consecutively without duplication throughout each block of the subdivision. The numbers shall be solid and sufficient in size and thickness to stand out and shall be placed so as to not obliterate any figure and shall not be enclosed in any design. Where adjoining blocks appear on separate sheets, the adjoining blocks shall be shown on both sheets complete with centerline and property line data. Letters shall not be used to identify block or lot numbers. C. The final map shall particularly define, delineate and designate all lots intended for sale or reserved for private purposes, and all parcels offered for dedication for any purpose, public or private, with all dimensions, boundaries and courses clearly shown and defined in every case. Parcels offered for dedication but not accepted shall be designated by letter in writing. D. If the final map is comprised of more than one sheet, in addition to the other requirements, there shall be an index map on the first sheet indicating the portion of the final map on each subsequent page. E. Monument to monument distance and bearing will be properly indicated on all monument lines. F. Every sheet comprising the final map shall bear the scale, north point, legend, sheet number and number of sheets comprising the map. G. Whenever the city engineer has established a system of coordinates, the survey for the final map shall be tied into such system. To determine the boundaries of the subdivision, the final map shall show clearly the stakes, monuments or other evidences wherever found on the ground. The adjoining corners of all adjoining subdivisions shall be identified by lot and block number, subdivision name and place of record or other property designation. H. Sufficient data shall be shown on the final map to determine readily the bearing and length of every lot line, block line and boundary line. Dimensions of the lot line shall be shown in feet and thousandths of a foot. No ditto marks shall be used. Lots containing one acre or more shall show total acreage to the nearest thousandth. Bearing and length of straight lines and radii, arc lengths and angles for all curves as may be necessary to determine the centers of curves and tangent points shall be shown. All angular measurements will be shown to an accuracy of one second. Whenever a portion of a curve is not clear as to the location of its radii point, a clarifying note shall be included on the map. I. Whenever the city engineer has established the centerline of a street or alley adjacent to or in the proposed subdivision, the ties shall be made to such center lines on the final map, and any monuments or reference points thereon. J. The map shall show the side lines of all easements to which the lots are subject. The easements shall be clearly labeled and identified, and if already of record, the recorded reference shall be given. If any easement is not definitely located of record, a statement of such easement shall appear on the title sheet. Easements for storm drains, sewers, public utilities and other purposes shall be denoted by the fine dotted lines. The width of the easement and the lengths and bearings of the lines thereof and sufficient ties thereto, definitely to locate the easement with respect to the subdivision, shall be shown. If the easement is being dedicated by the map, it shall be properly referenced in the owner's certificate of dedication.
(Ord. 795 § 1 (part), 1974: prior code § 26-18)
Ask a question about Daly City law
Corpus searches the Daly City sections it holds and shows the ones that match, with their citations. Free, no sign-in.
