For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 10.41.010 — Authority and application

Municipal Code, City of Elk Grove, California · Elk Grove Municipal Code § 10.41.010

Corpus is an independent public-information project, not the official City of Elk Grove website. Stable reference: corpuslaw.us/code/4cb11383-2216-4262-8a20-64b475a261b2

§ 10.41.010: Authority and application.

The Director is authorized to designate certain trucking terminals as interstate truck terminals and certain City roadways or parts thereof as terminal access routes for interstate trucks in accordance with Section 35401.5 of the Vehicle Code, as follows: A. As used in this chapter, “interstate truck” shall mean a combination of vehicles as described in Section 35401.5 of the Vehicle Code and not exceeding the lengths set forth therein, and “terminal” shall have the meaning specified in Section 35401.5 of the Vehicle Code. B. Any interested person desiring an access route to an interstate truck terminal facility from the Federally designated highway system shall submit to the Director an application, on a form as provided by the Director, together with such information as may be required by the Director and appropriate fees. C. The Director will cause an investigation to be made to ascertain whether or not the proposed terminal facility meets the requirements for an interstate truck terminal. Upon his approval of that designation, he will then determine the capability of the route requested and alternate routes, whether requested or not. Determination of route capability will include, without limitation, a review of adequate turning radius and lane widths of ramps, intersections and roadways and general traffic conditions such as sight distance, speed and traffic volumes. No access off a Federally designated highway system will be approved without the approval of the State of California Department of Transportation. D. Should the requested route pass through the City of Elk Grove to a terminal located in another jurisdiction, the applicant shall submit proof of compliance with that jurisdiction’s application process. Coordination of the approval of the route through the City will be the responsibility of the entity which controls the terminal’s land use.

( Ord. 2000-1 § 1, eff. 7-1-2000 ; Ord. 2000-14A § 1, eff. 10-25-2000 ; Ord. 7-2009 § 3, eff. 5-1-2009 )

Ask a question about Elk Grove law

Corpus searches the Elk Grove sections it holds and shows the ones that match, with their citations. Free, no sign-in.