§ 12.09.030 — Trench restoration fee
Municipal Code, City of Elk Grove, California · Elk Grove Municipal Code § 12.09.030
Corpus is an independent public-information project, not the official City of Elk Grove website. Stable reference: corpuslaw.us/code/2d8ac235-e2d2-475d-b8bf-b1c1c92e3ecc
§ 12.09.030: Trench restoration fee.
At the time any permit is issued, improvement plan approved, or work performed that causes an excavation of a paved City street, the applicant shall pay a trench restoration fee, in addition to the fee required by the encroachment permit or other administrative fees. The fee shall be in the amount set forth on the trench cut fee schedules as may be established by resolution of the City Council. Excavations performed by method of micro-trenching or Rapid Connect trenching shall have a trench restoration fee assessment area that equals one (1' 0") foot multiplied by the length of the excavation and must incorporate rates set forth in the fee schedule for trenches less than four (4' 0") feet deep. A trench restoration fee shall not be required for the following excavations: A. In a City street that the City has scheduled for reconstruction or resurfacing either during the fiscal year (July 1st to June 30th), when the excavation permit is issued or during the immediately following fiscal year; B. In a City street where the pavement condition index (PCI), as defined by the City’s Pavement Management System, is less than twenty-five (25) PCI on the date the excavation permit is issued; C. For work performed by and for the Department; D. For potholing to verify utility depth or location; E. Where work will include reconstruction or resurfacing of all or a significant portion of the City street where the excavation is made; provided, that the Director approves the reconstruction or resurfacing; F. Made for a utility relocation required by the City to accommodate a proper governmental use of a City street; G. For owners possessing a valid pavement life performance warranty agreement with the City as set forth in EGMC Section 12.09.080; H. Trenchless excavations greater than three (3' 0") feet in depth of cover over the utility facility not requiring a significant surface incision greater than industry bore pit standards may be excluded at the discretion of the Director.
( Ord. 2000-1 § 1, eff. 7-1-2000 ; Ord. 2000-14A § 1, eff. 10-25-2000 ; Ord. 7-2009 § 3, eff. 5-1-2009 ; Ord. 13-2025 § 3 (Exh. A), eff. 7-25-2025 )
Ask a question about Elk Grove law
Corpus searches the Elk Grove sections it holds and shows the ones that match, with their citations. Free, no sign-in.
