§ 16.07.300 — Permit application processing
Municipal Code, City of Elk Grove, California · Elk Grove Municipal Code § 16.07.300
Corpus is an independent public-information project, not the official City of Elk Grove website. Stable reference: corpuslaw.us/code/a1851bcf-6425-494f-b033-6ec6f7531854
§ 16.07.300: Permit application processing.
A. Prior to submitting an application for processing, the applicant shall verify, subject to the technical review set forth at EGMC Section 16.07.400, that the installation of an electric vehicle charging station shall not have specific, adverse impacts to public health and safety and building occupants. Verification by the applicant includes but is not limited to: electrical system capacity and loads; electrical system wiring, bonding and overcurrent protection; building infrastructure affected by charging station equipment and associated conduits; areas of charging station equipment and vehicle parking. B. Subject to the technical review set forth at EGMC Section 16.07.400, a permit application that satisfies the information requirements in the City’s adopted checklist shall be deemed complete and be promptly processed. Upon confirmation by the Building Official that the permit application and supporting documents meet the requirements of the City adopted checklist, are consistent with all applicable laws and health and safety standards, and do not require a minor conditional use permit or parking reduction permit following the technical review set forth at EGMC Section 16.07.400, the City Building Official shall, consistent with Section 65850.7 of the Government Code, approve the application and issue all necessary permits. Such approval does not authorize an applicant to energize or utilize the electric vehicle charging station until approval is granted by the electrical utility serving the City of Elk Grove. If the Building Official determines that the permit application is incomplete, he or she shall, within thirty (30) days of receipt of an application or resubmitted application or application materials, issue a written correction notice to the applicant, detailing all deficiencies in the application and any additional information required to be eligible for expedited permit issuance. Failure to timely issue a notice of incomplete application within the time frames set forth herein shall result in the application being deemed complete. C. Consistent with Section 65850.7 of the Government Code, the Building Official shall allow for electronic submittal of permit applications covered by this article and associated supporting documentation. In accepting such permit applications, the Building Official shall also accept electronic signatures on all forms, applications, and other documentation in lieu of a wet signature by any applicant.
( Ord. 25-2017 § 3, eff. 10-27-2017 )
Ask a question about Elk Grove law
Corpus searches the Elk Grove sections it holds and shows the ones that match, with their citations. Free, no sign-in.