§ 22.16.050 — Vesting tentative maps

Municipal Code, City of Elk Grove, California · Elk Grove Municipal Code § 22.16.050

Corpus is an independent public-information project, not the official City of Elk Grove website. Stable reference: corpuslaw.us/code/60bc9b47-932e-474a-bfbd-724b2049784d

§ 22.16.050: Vesting tentative maps.

Whenever a provision of the Subdivision Map Act or this title requires the filing of a tentative map (e.g., a tentative subdivision map, tentative parcel map), a vesting tentative map may instead be filed. Such vesting tentative map shall be in accordance with the provisions of this chapter. If a subdivider does not seek the rights conferred by the vesting tentative map statute, the filing of a vesting tentative map shall not be a prerequisite to any approval for any proposed subdivision, permit for construction, or work preparatory to construction. A. Application for Vesting Tentative Map. A vesting tentative map shall be filed in the same form and have the same content as required by this title for tentative maps. The application shall be filed in the same manner as tentative maps. At the time a vesting tentative map is filed, it shall have printed conspicuously on its face the words “Vesting Tentative Map.” B. Additional Submittal Requirements. At the time a vesting tentative subdivision map is filed, the subdivider shall also supply the information listed below to the City. The City may request, and the applicant shall promptly furnish, information as may reasonably be necessary to enable the City to evaluate the vesting effect that would follow from approval of the map. 1. A grading plan in conformance with the City grading ordinance and design standards. The grading plan shall contain precise grading of the entire subdivision and shall include all existing and proposed topography. The proposed topography shall include, but not be limited to, the elevations on all building pads, street grades and elevations at all lot corners; 2. Complete sanitary sewer plans accompanied by a sewer area study; 3. Complete water plans; 4. Complete storm drain plans; 5. Complete street plans; 6. Complete landscape plans; 7. Any geological studies, if required; 8. A complete drainage study. The study shall include, but not be limited to, a ten (10) year drainage study along with the one hundred (100) year drainage study. The one hundred (100) year study shall show the hydraulic grade line (HGL) at critical locations for each subdivision unit; 9. A complete site plan showing the buildings and exterior features of each lot. For single-family detached lots the site plan shall show the typical building envelopes. It shall also show all building setbacks, building heights, number of stories, driveway locations, landscaped areas and all other improvements proposed to be installed (this may be waived at the discretion of the Community Development Director); 10. Any engineering calculations and cost estimates for all improvement plans; 11. A tree preservation plan; 12. A soils report prepared by a soils engineer; and 13. Any and all other studies, reports, plans, specifications or additional information required by the Community Development Director. C. Development Rights Upon Approval. 1. Generally. The approval of a vesting tentative map by the City shall confer a vested right to apply for permits needed to proceed with development and have the City exercise its discretion to approve, disapprove, or approve such permits with conditions, on the basis of ordinances, policies, and standards in effect at the time the application was determined to be complete pursuant to Section 65943 of the Subdivision Map Act. 2. Disclaimers. a. This section does not enlarge, diminish, or alter the power of the City to deny approval of the requested project or any part thereof, or to impose conditions on the approval of a project. b. Nothing in this section removes, diminishes, or affects the obligation of any subdivider or local agency to comply with the conditions and requirements of any State or Federal laws, regulations, or policies. c. In the event that Section 66474.2 of the Subdivision Map Act is repealed, any subsequent approvals of vested maps shall confer a vested right to proceed with development in substantial compliance with ordinances, policies, and standards in effect at the time the vesting map is approved or conditionally approved, rather than at the time the application was determined to be complete. d. Notwithstanding this section, the City may condition or deny a permit, extension, or entitlement, including, but not limited to, final maps and building permits, if it determines any of the following: i. A failure to do so would place the residents of the subdivision or the immediate community, or both, in a condition dangerous to their health or safety, or both; ii. The condition or denial is required in order to comply with State or Federal law. D. Administration of Vested Rights. In administering an approved vesting map, the following shall be applicable: 1. Concurrent Approvals. Approval of a vesting tentative map applies only to actions considered and approved by the designated approving authority. If the vesting tentative map was approved with conditions, the approval is subject to those conditions. If related applications for discretionary permits were approved in conjunction with the vesting tentative map, the approvals are subject to applicable ordinances, policies, and standards granting those entitlements, including any conditions thereof. 2. Initial Life of Vested Rights. The rights conferred by a vesting tentative map as provided by this chapter shall last for an initial period of two (2) years after recording of the final map. 3. Extension of Vested Rights Through Recording of a Final Map. When several final maps are recorded on various phases of a project covered by a single vesting tentative map, the initial “vesting period” shall begin for each phase on the date the final map for that phase is recorded. 4. Extension of Vested Rights Through Period for Subsequent Approvals. The initial time period shall be automatically extended by any time used by the local agency for processing a complete application for a grading permit or for design or architectural review, if the time used by the local agency to process the application exceeds thirty (30) days from the date that a complete application is filed. 5. Extension of Vested Rights by Moratorium or Stay. Vesting rights shall automatically be extended at any time during which a development moratorium or stay on the project is in effect. 6. Automatic Extension of Vested Rights. Vesting rights shall automatically be extended by any time used by a City department for processing a complete application for a grading permit or for design or architectural review, if the time used by the City exceeds thirty (30) days from the date a complete application is filed. 7. Extension of Vested Rights Through Building Permit. If the subdivider submits a complete application for a building permit during the periods of time specified above, the rights conferred by this article shall continue until the expiration of that permit, or any extension of that permit granted by the City. 8. Termination of Vested Rights. Vested rights that have been conferred shall end on the occurrence of the following, whichever comes first: a. A final map is not recorded within the initial life of the vesting tentative map unless a longer period is provided by State law or an extension is granted as provided by this chapter. b. If a final map is recorded, the vesting rights shall end two (2) years after the date of final map recordation as provided in subsection (D)(2) of this section. c. The expiration of a building permit, including extension, issued pursuant to a vesting tentative map, and issued during the time vesting rights are valid. d. Vesting rights shall automatically be extended by any time used by a City department for processing a complete application for a grading permit or for design review, if the time used by the City exceeds thirty (30) days from the date a complete application is filed.

( Ord. 13-2025 § 3 (Exh. D), eff. 7-25-2025 )

Ask a question about Elk Grove law

Corpus searches the Elk Grove sections it holds and shows the ones that match, with their citations. Free, no sign-in.