§ 12.20.050 — Refilling

Municipal Code of the City of El Monte, California (Codified through Ordinance No. 3055, passed June 11, 2025. (Supp. No. 36, Update 1)) · El Monte Municipal Code § 12.20.050

Corpus is an independent public-information project, not the official City of El Monte website. Stable reference: corpuslaw.us/code/9e483c88-cb22-4e05-bf73-0e7929b73640

12.20.050 - Refilling.

All excavations shall be refilled in the following manner: In streets which have not been macadamized, paved or oiled and where water is available and where in the opinion of said City Engineer the material excavated can be properly settled by the use of water, the trench may be filled to within not less than one foot from the surface and shall then be thoroughly flooded and the material settled by poling or with shovels. If required by the City Engineer the filling shall be settled at not more than two (2) intermediate depths to be determined by the said City Engineer before it is brought to within one foot of the surface. After the material has been allowed to settle, the trench shall be filled to the surface again, flooded and then allowed to settle. It shall then be filled four (4) inches above the surface of the street and all trenches running parallel to the street shall be thoroughly rolled by the person refilling such excavation, with a roller weighing not less than five (5) tons. If the street where such excavation is made has been macadamized, paved or oiled the macadam, pavement or oiled surface removed therefrom shall be kept separate from all other materials. The trench shall be refilled in the manner hereinbefore provided, two (2) inches above the surface of such macadamized, paved or oiled street, and all trenches running parallel to the street shall then be rolled by the person refilling such excavation with a roller weighing not less than five (5) tons. When such refilling is in proper condition, temporary pavement shall be placed as set forth in Section 12.20.060. In all cases where a pipe not exceeding four (4) inches in diameter is placed in an excavation, all the material removed from such excavation shall be replaced therein. Any surplus material not required in refilling trenches shall be promptly removed by the person to whom the permit was granted.

(Prior code § 7304)

Ask a question about El Monte law

Corpus searches the El Monte sections it holds and shows the ones that match, with their citations. Free, no sign-in.