§ 13.20.020 — Stormwater pollution control measures for development planning and construction activities
Municipal Code of the City of El Monte, California (Codified through Ordinance No. 3055, passed June 11, 2025. (Supp. No. 36, Update 1)) · El Monte Municipal Code § 13.20.020
Corpus is an independent public-information project, not the official City of El Monte website. Stable reference: corpuslaw.us/code/9f66e563-4b65-448e-879c-85c88263cc45
13.20.020 - Stormwater pollution control measures for development planning and construction activities.
A. Objective. The provisions of this section contain requirements for site design and post-construction BMP operation and maintenance of development and redevelopment projects to comply with the city of El Monte's municipal NPDES permit (permit) currently in effect at the time of development application submittal, to lessen the water quality impacts of development by using smart growth practices, and integrate LID design principles to mimic predevelopment hydrology through infiltration, evapotranspiration and rainfall harvest and use. B. Scope. This section contains requirements for stormwater pollution control measures in development and redevelopment projects and authorizes the city of El Monte to further define and adopt stormwater pollution control measures, to develop LID principles and requirements, including but not limited to the objectives and specifications for integration of LID strategies, and to grant alternative compliance for technical infeasibility, as allowed by the municipal NPDES permit currently in effect at the time of development application, and collect fees from projects granted exceptions. Except as otherwise provided herein, the city of El Monte shall administer, implement and enforce the provisions of this section. Any guidance documents supporting implementation of the municipal NPDES permit requirements, currently in effect at the time of development application submittal, meeting application in this chapter, are hereby incorporated by reference. C. Applicability. This section is applicable to projects as defined below: 1. All development and redevelopment projects, termed "planning priority projects," as defined in the municipal NPDES permit currently in effect at the time of the development application, shall comply with subsection E of Section 13.20.020. 2. Street and road construction projects of ten thousand (10,000) square feet or more of impervious surface, in addition to complying with all other applicable provisions of Section 13.20.020, shall follow USEPA guidance regarding "Managing West Weather with Green Infrastructure: Green Streets" (December 2008, EPA-833-F-08-009) to the maximum extent practicable. This subsection applies to standalone streets, roads, highways, and freeway projects, and also applies to streets within larger projects, including capital improvement projects (CIPs). 3. Single family hillside homes (as defined in City Code Section 13.20.010 subsection C), in addition to complying with all other applicable provisions of Section 13.20.020, shall implement the following measures: i. Conserve natural areas. ii. Protect slopes and channels. iii. Provide storm drain stenciling and signage. iv. Divert roof runoff to vegetated areas before discharge unless the diversion would results in slope instability. v. Direct surface flow to vegetated areas before discharge unless the diversion would result in slope instability. 4. Any other project, as deemed appropriate by the department, submitted for complete discretionary or non-discretionary permit application filed with the department after December 31, 2012. D. Effective Date. The planning and land development requirements contained in this chapter shall become effective thirty (30) days from the adoption of the ordinance codified in this chapter. This includes all applicable projects listed in subsection C of Section 13.20.020 that are discretionary permit projects or project phases that have not been deemed complete for processing, or discretionary permit projects without vesting tentative maps that have not requested and received an extension of previously granted approvals within thirty (30) days of adoption of the ordinance. Projects that have been deemed complete within thirty (30) days of adoption of the ordinance are not subject to the requirements of this chapter. E. Stormwater Pollution Control Requirements. All applicable projects listed in subsection C of Section 13.20.020 shall be designed to control pollutants, pollutant loads, and runoff volumes to the maximum extent feasible by minimizing impervious surface area and controlling runoff from impervious surfaces through infiltration, evapotranspiration, bioretention and/or rainfall harvest and use. All applicable projects shall prepare a LID plan that is submitted to and approved by the Department. All LID plans shall comply with the following: a. Low impact development standards and BMP implementation hierarchy: All project applicants shall: i. Properly select, design and maintain LID and hydromodification control BMPs to address pollutants that are likely to be generated, reduce changes to pre-development hydrology, assure long-term function and avoid breeding of vectors. ii. Prioritize the selection of BMPs to remove stormwater pollutants, reduce stormwater runoff volume, and beneficially use stormwater to support an integrated approach to protecting water quality and managing water resources in the following order: 1. On-site infiltration, bioretention and/or rainfall harvest and use; then 2. On-site biofiltration, offsite groundwater replenishment, and/or off-site retrofit. a. If using biofiltration due to demonstrated technical infeasibility, then the volume to be biofiltrated shall be calculated using the following equation: B v = 1.5 * [SWQD v - R v ] Where: B v = biofiltration volume SWQD v = the storm water runoff from a 0.75 inch, 24-hour storm or the 85th percentile storm, whichever is greater R v = volume reliably retained on-site b. Retain onsite the stormwater quality design volume (SWQDv) as required per the permit currently in effect at the time of development application submittal. c. When one hundred (100) percent onsite retention of the SWQDv is technically infeasible, partially or fully, the infeasibility shall be demonstrated in the submitted LID plan and approved by the Department. Technical infeasibility may result from conditions that may include, but are not limited to: i. The infiltration rate of saturated in-situ soils is less than 0.3 inch per hour and it is not technically feasible to amend the in-situ soils to attain an infiltration rate necessary to achieve reliable performance of infiltration or bioretention BMPs in retaining the SWQDv onsite. ii. Locations where seasonal high groundwater is within ten (10) feet of surface grade. iii. Locations within one hundred (100) feet of a groundwater well used for drinking water. iv. Brownfield development sites or other locations where pollutant mobilization is a documented concern. v. Locations with potential geotechnical hazards. vi. Smart growth and infill or redevelopment locations where the density and/or nature of the project would create significant difficulty for compliance with the onsite volume retention requirement. d. Projects that have successfully demonstrated technical infeasibility for full retention of the SWQDv to the Department, shall implement alternate compliance measures (alternate mitigation options) as designated in the permit currently in effect at the time of development application submittal. e. Additional alternative compliance options, such as offsite infiltration, may be available to the project. The project applicant should contact the Department to determine eligibility. Alternative compliance options are as further specified in the permit currently in effect at the time of development application submittal. f. A multi-phased project shall comply with the standards and requirements of this section for all of its phases by: i. Designing a system acceptable to the Department to satisfy these standards and requirements for the entire site during the first phase; and/or ii. Implementing these standards and requirements for each phase of development or redevelopment of the project during the first phase or prior to commencement of construction of a later phase, to the extent necessary to treat the stormwater from such later phase. iii. For purposes of this subsection, "multi-phased project" shall mean any planning priority project implemented over more than one phase and the site of a multi-phased project shall include any land and water area designed and used to store, treat or manage stormwater runoff in connection with the development or redevelopment, including any tracts, lots, or parcels of real property, whether developed or not, associated with, functionally connected to, or under common ownership or control with such development or redevelopment. g. Minimize hydromodification impacts by maintaining the project's pre-development storm water runoff volumes, flow rates, and durations by maintaining the erosion potential (EP) in streams at 1, or implementing hydromodification control BMPs and/or LID strategies, or other restoration measures to meet hydromodification control criteria as designated in the permit currently in effect at the time of development application submittal. h. Department may exempt certain applicable projects listed in subsection C of Section 13.20.020 from hydromodification control requirements where assessments of downstream channel conditions and proposed discharge hydrology indicate that adverse hydromodification effects to beneficial uses of natural drainage systems are unlikely: i. The replacement, maintenance or repair of existing, publicly-maintained flood control facilities, storm drains, or transportation networks. ii. Redevelopment of a previously developed site in an urbanized area that does not increase the effective impervious area or decrease the infiltration capacity of pervious areas compared to the pre-project conditions. iii. Projects that have any increased discharge directly or via a storm drain to a sump, lake, area under tidal influence, into a waterway that has an estimated one-hundred-year peak flow of twenty-five thousand (25,000) cubic feet per second or more, or other receiving water that is not susceptible to hydromodification impacts. iv. Projects that discharge directly or through a storm drain into concrete or other engineered (not natural) channels (e.g. channelized or armored rip rap, shotcrete, etc.) which, in turn, discharge into receiving water that is not susceptible to hydromodification impacts. v. Single family homes that incorporate LID BMPs. F. LID Plan Review. The applicant for any development project shall submit a LID plan to the Department for review and approval that provides a comprehensive, technical discussion of how the development project will comply with this Section 13.20.020. A deposit and fee to recover associated review costs shall be required. Timing for obtaining LID plan approval shall be as follows: a. For subdivisions, the LID plan shall be approved prior to the tentative map. b. For any development project requiring a conditional use permit (CUP) or other discretionary entitlement required under (City Code Section 16.38.010, General Purposes), the LID plan shall be approved prior to the issuance of any such CUP or other discretionary entitlement. c. For all development projects, the LID plan shall be approved prior to issuance of a grading permit for the development project, or when no grading permit is required, prior to the issuance of a building permit. When no grading or building permit is required, LID plan approval shall be prior to the commencement of any development activity or as otherwise indicated in the non-discretionary land use approval. G. Ongoing Maintenance. a. All project's LID and hydromodification control features shall be maintained and shall remain operable at all times and shall not be removed from the project unless and until such features have been replaced with other LID and/or hydromodification control features in accordance with this section. b. Unless excused by the Department, all LID plans shall include an operation and maintenance plan and monitoring plan for all LID practices, LID BMPs and hydromodification control features incorporated into the project. c. The owner of the subject development project site shall record a covenant or agreement, approved by the Department, in the office of the Los Angeles County Registrar-Recorder/County Clerk indicating that the owner of the subject development project site is aware of and agrees to the requirements in this subsection. The covenant or agreement shall also include a diagram of the development project site indicating the location and type of each LID and hydromodification control feature incorporated into the development project. The time to record such convenient or agreement shall be as follows: i. For any subdivision, prior to final map approval. ii. For any other development project, prior to issuance of a grading plan approval for the development project, and when no grading plan approval is required, prior to issuance of building plan approval for the development project. H. Other Agencies of the city of El Monte. All city of El Monte departments, offices, entities and agencies, shall establish administrative procedures necessary to implement the provisions of this chapter on all applicable projects, as listed in subsection C of Section 13.20.020, and report their activities annually to the Department. I. Validity. If any provision of this chapter is found to be unconstitutional or otherwise invalid by any court of competent jurisdiction, such invalidity shall not affect remaining provisions of this chapter that are declared to be severable. J. Certification. The City Clerk shall certify to the passage of this chapter and have it published in accordance with Council policy.
(Ord. No. 2840, § 2(Exh. A), 6-10-2014)