§ 17.74.260 — Reporting
Municipal Code of the City of El Monte, California (Codified through Ordinance No. 3055, passed June 11, 2025. (Supp. No. 36, Update 1)) · El Monte Municipal Code § 17.74.260
Corpus is an independent public-information project, not the official City of El Monte website. Stable reference: corpuslaw.us/code/9e5c5c6f-8c8c-4464-9ebb-98a03c123c1c
17.74.260 - Reporting.
A. The city is responsible for administering this chapter and submitting an annual report to the California Department of Water Resources on January 31 st of each year. B. The city's annual report shall address the following: 1. Define the reporting period. The reporting period shall commence on January 1 st of each year and end on December 31 st of each year. 2. State if the city is using a locally modified Water Efficient Landscape Ordinance (WELO) or the MWELO. If the city is using a locally modified WELO, state how it differs from MWELO, is at least as efficient as MWELO and whether there are any exemptions specified. 3. State the entity responsible for implementing this chapter. 4. State number and types of projects subject to this chapter during the specified reporting period. 5. State the total area (in square feet or acres) subject to this chapter over the reporting period, if available. 6. Provide the number of new housing starts, new commercial projects, and landscape retrofits during the reporting period. 7. Describe the procedure for review of projects subject to this chapter. 8. Describe actions taken to verify compliance. Is a plan check performed; if so, by what entity? Is a site inspection performed; if so, by what entity? Is a post-installation audit required; if so, by whom? 9. Describe enforcement measures. 10. Explain challenges to implementing and enforcing the ordinance. 11. Describe educational and other needs to properly apply this chapter. C. List of Worksheets and Tables. 1. Table 17.74-1—Reference Evapotranspiration (ETo). 2. Table 17.74-2—Sample Water Efficient Landscape Worksheet. 3. Table 17.74-3—ETAF Calculations. 4. Table 17.74-4—Sample Certificate of Completion. a. Part 1: Project information sheet. b. Part 2: Certification of installation according to the landscape documentation package. c. Part 3: Irrigation schedule. d. Part 4. Schedule of landscape and irrigation maintenance. e. Part 5: Landscape irrigation audit report. f. Part 6: Soil management report. 5. Table 17.74-5—Sample Certificate of Completion. a. Part A: Submitting a landscape documentation package. b. Part B: Incorporating compost. c. Part C: Plant materials. d. Part D: Turf areas. e. Part E: Irrigation systems. f. Part F: Nonresidential projects with landscape areas greater than one thousand (1,000) square feet. Table 17.74-1—Reference Evapotranspiration (ETo) 18 Los Angeles County | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Annual ETo Burbank | 2.1 | 2.8 | 3.7 | 4.7 | 5.1 | 6.0 | 6.6 | 6.7 | 5.4 | 4.0 | 2.6 | 2.0 | 51.7 Claremont | 2.0 | 2.3 | 3.4 | 4.6 | 5.0 | 6.0 | 7.0 | 7.0 | 5.3 | 4.0 | 2.7 | 2.1 | 51.3 El Dorado | 1.7 | 2.2 | 3.6 | 4.8 | 5.1 | 5.7 | 5.9 | 5.9 | 4.4 | 3.2 | 2.2 | 1.7 | 46.3 Glendale | 2.0 | 2.2 | 3.3 | 3.8 | 4.7 | 4.8 | 5.7 | 5.6 | 4.3 | 3.3 | 2.2 | 1.8 | 43.7 Glendora | 2.0 | 2.5 | 3.6 | 4.9 | 5.4 | 6.1 | 7.3 | 6.8 | 5.7 | 4.2 | 2.6 | 2.0 | 53.1 Gorman | 1.6 | 2.2 | 3.4 | 4.6 | 5.5 | 7.4 | 7.7 | 7.1 | 5.9 | 3.6 | 2.4 | 1.1 | 52.4 Hollywood Hills | 2.1 | 2.2 | 3.8 | 5.4 | 6.0 | 6.5 | 6.7 | 6.4 | 5.2 | 3.7 | 2.8 | 2.1 | 52.8 Lancaster | 2.1 | 3.0 | 4.6 | 5.9 | 8.5 | 9.7 | 11.0 | 9.8 | 7.3 | 4.6 | 2.8 | 1.7 | 71.1 Long Beach | 1.8 | 2.1 | 3.3 | 3.9 | 4.5 | 4.3 | 5.3 | 4.7 | 3.7 | 2.8 | 1.8 | 1.5 | 39.7 Los Angeles | 2.2 | 2.7 | 3.7 | 4.7 | 5.5 | 5.8 | 6.2 | 5.9 | 5.0 | 3.9 | 2.6 | 1.9 | 50.1 Monrovia | 2.2 | 2.3 | 3.8 | 4.3 | 5.5 | 5.9 | 6.9 | 6.4 | 5.1 | 3.2 | 2.5 | 2.0 | 50.2 Palmdale | 2.0 | 2.6 | 4.6 | 6.2 | 7.3 | 8.9 | 9.8 | 9.0 | 6.5 | 4.7 | 2.7 | 2.1 | 66.2 Pasadena | 2.1 | 2.7 | 3.7 | 4.7 | 5.1 | 6.0 | 7.1 | 6.7 | 5.6 | 4.2 | 2.6 | 2.0 | 52.3 Pearblossom | 1.7 | 2.4 | 3.7 | 4.7 | 7.3 | 7.7 | 9.9 | 7.9 | 6.4 | 4.0 | 2.6 | 1.6 | 59.9 Pomona | 1.7 | 2.0 | 3.4 | 4.5 | 5.0 | 5.8 | 6.5 | 6.4 | 4.7 | 3.5 | 2.3 | 1.7 | 47.5 Redondo Beach | 2.2 | 2.4 | 3.3 | 3.8 | 4.5 | 4.7 | 5.4 | 4.8 | 4.4 | 2.8 | 2.4 | 2.0 | 42.6 San Fernando | 2.0 | 2.7 | 3.5 | 4.6 | 5.5 | 5.9 | 7.3 | 6.7 | 5.3 | 3.9 | 2.6 | 2.0 | 52.0 Santa Clarita | 2.8 | 2.8 | 4.1 | 5.6 | 6.0 | 6.8 | 7.6 | 7.8 | 5.8 | 5.2 | 3.7 | 3.2 | 61.5 Santa Monica | 1.8 | 2.1 | 3.3 | 4.5 | 4.7 | 5.0 | 5.4 | 5.4 | 3.9 | 3.4 | 2.4 | 2.2 | 44.2 Notes: 18 The values in this table were derived from: (1) California Irrigation Management Information System (CIMIS); (2) Eto Zones Map, UC Dept. of Land, Air and Water Resources and California Dept. of Water Resources 1999; (3) Eto for California, University of California, Department of Agriculture and Natural Resources (1987) Bulletin 1922; and (4) Determining Daily Eto, Cooperative Extension UC Division of Agriculture and Natural Resources (1987), Publication Leaflet 21426. Table 17.74-2—Sample Water Efficient Landscape Worksheet This worksheet is filled out by the project applicant and it is a required element of the Landscape Documentation Package. Reference Evapotranspiration (ETo): _______ Hydrozone # /Planting Description 19 | Plant Factor (PF) | Irrigation Method 20 | Irrigation Efficiency (IE) 21 | ETAF (PF/IE) | Landscape Area (sq. ft.) | ETAF × Area | Estimated Total Water Use (ETWU) 22 Regular Landscape Areas: Totals | (A) | (B) Special Landscape Areas: 1 1 1 Totals | (C) | (D) ETWU Total Maximum Allowed Water Allowance (WAWA) 23 Notes: 19 Hydrozone #/Planting Description e.g. front lawn, low water use plantings and medium water use planning. 20 Irrigation Method—Overhead spray or drip 21 Irrigation Efficiency—0.75 for spray head/0.81 for drip 22 ETWU (Annual Gallons Required) = ETo × 0.62 × ETAF × Area. Where 0.62 is a conversion factor that converts acre-inches per year to gallons per square foot per year. 23 MAWA (Annual Gallons Allowed) = (ETo)(0.62)[(ETAF × LA) + ((1-ETAF) × SLA)]. Where 0.62 is a conversion factor that converts acre-inches per acre per year, to gallons per square foot per year, LA is the total landscape area in square feet, SLA is the total special landscape area in square feet, and ETAF is 0.55 for residential areas and 0.45 for nonresidential areas. Table 17.74-3—ETAF Calculations Regular Landscape Areas: Total ETAF × Area | (B) Total Area | (A) Average ETAF | B ÷ A Average ETAF for regular landscape areas must be 0.55 or below for residential areas, and 0.45 or below for nonresidential areas. All Landscape Areas: Total ETAF × area | (B+D) Total Area | (A+C) Sitewide ETAF | (B+D)+(A+C) Table 17.74-4—Sample Certificate of Completion 24 Part 1. Project information sheet: Project Information: Project Name | Date Project Address and Location: Street Address | Parcel, tract or lot number, if available City | Latitude/Longitude (optional) State | Zip Code Property Owner or his/her Designee: Name | Telephone No. Title | Email Address Company | Street Address City | State | Zip Code "I/we certify that I/we have received copies of all the documents within the Landscape Documentation Package and the Certificate of Completion and that it is our responsibility to see that the project is maintained in accordance with the Landscape and Irrigation Maintenance Schedule." ___________ Property Owner Signature | _______ Date Please answer the following: 1. | Date the Landscape Documentation Package was submitted to the city. 2. | Date the Landscape Documentation Package was approved by the city. 3. | Date that a copy of the Water Efficient Landscape Worksheet (including the Water Budget Calculation) was submitted to the local water purveyor. Part 2. Certification of installation according to the landscape documentation package: "I/we certify that based upon periodic site observations, the work has been substantially completed in accordance with the ordinance and that the landscape planting and irrigation installation conform with the criteria and specifications of the approved Landscape Documentation Package." ___________ Property Owner Signature | _______ Date Name (print) | Telephone No. Title | Email Address License No. or Certification No. Company | Street Address City | State | Zip Code Part 3. Irrigation schedule: Attach parameters of the irrigation schedule on controller per Section 17.74.130 of this chapter. Part 4. Schedule of landscape and irrigation maintenance: Attach schedule of Landscape and Irrigation Maintenance per Section 17.74.140 of this chapter. Part 5. Landscape irrigation audit report: Attach Landscape Irrigation Audit Report per Section 17.74.150 of this chapter. Part 6. Soil management report: Attach soil analysis report, if not previously submitted with the Landscape Documentation Package per Section 17.74.090 of this chapter. Attach documentation verifying implementation of recommendations from soil analysis report per Section 17.74.030 of this chapter. Notes: 24 This certification is filled out by the project applicant upon completion of the landscape project. Table 17.74-5—Sample Certificate of Completion This table contains prescriptive requirements which may be used as a compliance option to the Model Water Efficient Landscape Ordinance (MWELO). Compliance with the following items is mandatory and must be documented in a landscape plan in order to use the prescriptive compliance options: A. Submit a landscape documentation package which includes the following elements: 1. | Date. 2. | Project applicant. 3. | Project address (if available, parcel and/or lot numbers) 4. | Total landscape area (square feet), including a breakdown of turf and plant material. 5. | Project type (e.g., new, rehabilitated, public, private, cemetery, homeowner-installed). 6. | Water supply type (e.g., potable, recycled, well) and identify the local retail water purveyor if the applicant is not served by a private well. 7. | Contact information for the project applicant and proper owner. 8. | Applicant signature and date with statement, "I agree to comply with the requirements of the prescriptive compliance option to the MWELO." B. Incorporate compost at the following rate: 9. | Incorporate compost at a rate of at least four (4) cubic yards per 1,000 square feet to a depth of six (6) inches into landscape area (unless contra-indicated by a soil test). C. Plant material shall comply with the following: 10. | For residential areas, install climate adapted plants that require occasional, little or no summer water (average WUCOLS plant factor 0.3) for 75 percent of the plant area excluding edibles and areas using recycled water; for nonresidential areas, install climate adapted plants that require occasional, little or no summer water (average WUCOLS plant factor 0.3) for 100 percent of the plant area excluding edibles and areas using recycled water. 11. | A minimum of three-inch layer of mulch shall be applied on all exposed soil surfaces of planting areas except in turf areas, creeping or rooting groundcovers, or direct seeding applications where mulch is contraindicated. D. Turf shall comply with the following: 12. | Turf shall not exceed 25 percent of the landscape area in residential areas, and there shall be no turf in nonresidential areas; 13. | Turf shall not be planted on sloped areas which exceed a slope of one foot vertical elevation change for every four (4) feet of horizontal length; 14. | Turf is prohibited in parkways less than ten (10) feet wide, unless the parkway is adjacent to a parking strip and used to enter and exit vehicles. Any turf in parkways must be irrigated by sub-surface irrigation or by other technology that creates no overspray or runoff. E. Irrigation systems shall comply with the following: 15. | Automatic irrigation controllers are required and must use evapotranspiration or soil moisture sensor data and utilize a rain sensor. 16. | Irrigation controllers shall be of a type which does not lose programming data in the event the primary power source is interrupted. 17. | Irrigation controllers shall be of a type which does not lose programming data in the event the primary power source is interrupted. 18. | Manual shut-off valves (such as a gate valve, ball valve, or butterfly valve) shall be installed as close as possible to the point of connection of the water supply. 19. | All irrigation emission devices must meet the requirements set in the ANSI standard, ASABE/ICC 802-2014 "Landscape Irrigation Sprinkler and Emitter Standard." All sprinkler heads installed in the landscape must document a distribution uniformity low quarter of 0.65 or higher using the protocol defined in ASABE/ICC 802-2014. 20. | Areas less than ten (10) feet in width in any direction shall be irrigated with surface irrigation or other means that produces no runoff or overspray. F. Nonresidential projects with landscape areas greater than 1,000 square feet: 21. | A private submitter(s) to measure landscape water use shall be installed. At the time of final inspection, the permit applicant must provide the owner of the property with a certificate of completion, certificate of installation, irrigation schedule and a schedule of landscape and irrigation maintenance.
(Ord. No. 3053, § 3(Exh. A), 5-14-2025)
Ask a question about El Monte law
Corpus searches the El Monte sections it holds and shows the ones that match, with their citations. Free, no sign-in.
