§ 18.08.080 — Cable system construction and technical standards

Municipal Code of the City of El Monte, California (Codified through Ordinance No. 3055, passed June 11, 2025. (Supp. No. 36, Update 1)) · El Monte Municipal Code § 18.08.080

Corpus is an independent public-information project, not the official City of El Monte website. Stable reference: corpuslaw.us/code/c5150466-7acd-4ac3-a7d7-6fe3337af2d2

18.08.080 - Cable system construction and technical standards.

A. Applicable Cable System Construction Technical Standards. 1. Grantee shall construct, install, operate and maintain its cable system in a manner consistent with all applicable laws, ordinances, electrical codes, construction standards, governmental requirements, FCC technical standards, and any detailed standards set forth in its franchise agreement. Such applicable electrical codes and construction standards shall include the most current versions of the National Electrical Code (NEC), General Order No. 95 of the state of California's Public Utilities Commission, General Order No. 128 of the state of California's Public Utilities Commission, and the National Electrical Safety Code (NESC), to the extent the NESC does not conflict with the NEC or any rule, regulation, or order promulgated by the state of California's Public Utilities Commission. 2. Grantee shall provide to grantor, upon written request, a written report of the results of grantee's periodic proof of performance tests and signal leakage tests conducted pursuant to FCC and franchise standards and guidelines. 3. Any time the signal provided on grantee's cable system does not meet FCC technical standards or the technical standards of grantee's franchise application and/or grantee's franchise agreement, grantor may order grantee to make a pro rata rebate, in money or services, to each subscriber based upon the percentage by which the signal falls below the most stringent technical standard and upon the length of time that such condition has existed. Grantor shall follow the procedure for addressing franchise agreement violations described in Section 18.08.120(B) of this chapter, before ordering such a rebate. B. Noncompliance with Cable System Construction Technical Standards. Repeated and verified failure to maintain specified technical standards described or referenced in subsection A of this section, shall constitute a material breach of the franchise agreement. C. Cable System Construction. 1. Grantee shall not construct any cable system facilities until grantee has secured the necessary permits from grantor, or other responsible public agencies. Grantee shall be subject to all permit and bonding requirements applicable to contractors working within the public rights-of-way. No provision of this chapter or any franchise agreement shall be deemed a waiver of the obligation of a grantee to pay grantor for the issuance of such a permit. Furthermore, permit fees shall not constitute franchise fees nor be charged against franchise fees owed to the city. 2. Sixty (60) days and thirty (30) days prior to beginning any construction, rebuild, or upgrade of any cable system within the service area, and every sixty (60) days while engaged in such activity, grantee shall submit construction reports to the City Manager containing the following information: (i) a general description of the construction, rebuild, or upgrade activities to be undertaken by grantee during the following sixty (60) days; (ii) the status of necessary permits; (iii) the number of miles constructed and the number of homes passed as of the date of the report and the number of miles to be constructed and the number of homes to be passed during the sixty (60) days following the report; (iv) any conditions known to grantee which may affect the construction schedule; and (v) any other pertinent information required by the City Manager. Unless otherwise specified by the City Manager, such construction reports shall be required until completion of these cable system construction, upgrade, or rebuild activities, at which point in time grantee shall submit to the City Manager a final report addressing the information described in clauses (i) through (v) of this subsection. 3. In those areas of the city where transmission lines or distribution facilities of the public utilities providing telephone and electric power service are underground, grantee likewise shall construct, operate and maintain its transmission and distribution facilities underground. 4. In those areas of the city where grantee's cables are located on the above-ground transmission or distribution facilities of the public and/or municipal utility providing telephone or electric power service, and in the event that the facilities of both the telephone and electric power utilities subsequently are placed underground, then grantee likewise shall reconstruct, operate and maintain its transmission and distribution facilities underground, at grantee's cost. Certain of grantee's equipment, such as pedestals, amplifiers and power supplies, which normally are placed above ground, may continue to remain in above-ground enclosures, unless otherwise provided in the franchise agreement. 5. Any changes in or extensions of any poles, anchors, wires, cables, conduits, vaults, laterals or other fixtures and equipment (herein referred to as "structures"), or the construction of any additional structures, in, upon, along, across, under or over the public rights-of-way, shall be made under the direction of Public Works Director or a designee, who shall, if the proposed change, extension or construction conforms to the provisions hereof, issue written permits therefor. The height above public thoroughfares of all aerial wires shall conform to the requirements of the state regulatory body having jurisdiction thereof. 6. All transmission and distribution structures, lines and equipment erected by grantee shall be located so as not to interfere with the proper use of the public rights-of-way, and to cause minimum interference with the rights or reasonable convenience of property owners who adjoin any of the said public rights-of-way, and not to materially interfere with existing public and municipal utility installations. 7. In the event that any property or improvement of grantor in the public rights-of-way is disturbed or damaged by grantee or any of its contractors, agents or employees in connection with undertaking any and all work pursuant to the rights granted to grantee pursuant to this chapter and the franchise agreement, grantee shall promptly, at grantee's sole cost and expense, restore to grantor's satisfaction said property or improvement which was so disturbed or damaged. If such property or improvement shall (within two (2) years of grantee's restoration (or in the case of a street improvement, until the street is resurfaced if resurfaced prior to the expiration of the two (2) years) of the date the restoration was completed) become uneven, unsettled or otherwise require additional restorative work, repair or replacement because of the initial disturbance or damage to the property by grantee, then grantee, as soon as reasonably possible, shall, promptly upon receipt of written notice from grantor and at grantee's sole cost and expense, restore to grantor's satisfaction said property or improvement which was disturbed or damaged. Any such restoration by grantee shall be made in accordance with such materials and specifications as may, from time to time, be established by grantor. 8. Prior to commencing any work on the cable system in the public rights-of-way, grantee shall obtain any and all permits, licenses and authorizations lawfully required for such work. If emergency work on the cable system in the public right-of-way is required, grantee shall with all due diligence, seek to obtain any and all such required permits, licenses and authorizations within three (3) working days after commencing such emergency work. Prior to performing any work in the public right-of-way, grantee shall give appropriate notice to the "underground service alert" ("USA"), or any similar type service provider designated by grantor. 9. There shall be no unreasonable or unnecessary obstruction of the public rights-of-way by grantee in connection with any of the work provided for herein. Grantee shall maintain any barriers, signs and warning signals during any work performed on or about the public rights-of-way or adjacent thereto as may be necessary to reasonably avoid injury or damage to life and property. 10. If grantor lawfully elects to alter or change the grade or location of any public right-of-way, grantee shall, upon reasonable notice by grantor, and in a timely manner, remove, relay and relocate its poles, wires, cables, underground conduits, manholes and other fixtures at its own expense. 11. Grantee shall not place poles, conduits or other fixtures above or below ground where the same will interfere with any gas, electric, telephone fixtures, water hydrants or other utility, and all such poles, conduits or other fixtures placed in any public right-of-way shall be so placed as to comply with all ordinances of grantor. 12. In accordance with applicable law, grantee or any utility user of the public rights-of-way may be required by grantor to permit joint use of its poles and/or conduit located in the public rights-of-way, insofar as such joint use may be reasonably practicable and upon payment of a reasonable rental fee for such usage. In the absence of an agreement regarding such joint use, each party shall be entitled to exercise any rights and defenses provided by applicable law. 13. Grantee, on request of any person holding a moving permit issued by grantor, shall temporarily raise or lower its wires or fixtures to permit the moving of buildings. The expense of such temporary raising or lowering of wires or fixtures shall be paid by the person requesting the same, and grantee shall have the authority to require such payment in advance. Grantee shall be given not less than five (5) business days prior written notice to arrange for the temporary wire or equipment changes. 14. Grantee shall have the authority to trim any trees or other natural growth overhanging the public rights-of-way so as to prevent the branches of such trees or other natural growth from coming in contact with grantee's wires, cables and other equipment. Grantor may require all trimming of trees and natural growth to be done under its supervision and direction, at the expense of grantee. 15. Grantee shall be subject to any and all requirements established by grantor with regard to the placement and screening of grantee's facilities and equipment located in the public rights-of-way. Such requirements may include, but not be limited to, the use of landscaping to screen pedestals and cabinets and the requirement that construction be flush with the natural grade of the surrounding area. D. Multiple Franchises. 1. Subject to applicable law, in the event that more than one franchise is awarded, grantor reserves the right to limit the number of drop cables per residence, or to require that the drop cable(s) be utilized only by the cable operator selected by the resident to provide service. 2. Grantor reserves the right to grant an encroachment permit to a cable franchisee applicant to install conduit and/or cable in anticipation of the granting of a franchise. Such installations shall be at the applicant's risk, with no recourse against grantor in the event the pending franchise application is not granted. Grantor may require an applicant to provide a separate trench for its conduit and/or cable, at the applicant's cost. 3. If grantor authorizes or permits one or more additional cable systems to operate within the territorial limits of the city, grantor shall do so on condition that any additional cable system franchisee agree to indemnify and hold harmless and reimburse grantor and any existing grantee and any affected utility from and against all costs and expenses incurred in strengthening poles, replacing poles, rearranging attachments, placing facilities underground, and engaging in similar activities related to the construction of an additional cable system in the franchise area. Any existing grantee shall be designated a third party beneficiary of such conditions as are incorporated into the authorization(s) granted by the city to any new grantee.

(Ord. 2509 § 8, 2000)