For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 22-178 — Terms and conditions of wastewater discharge permit

Code of Ordinances, City of Escondido, California (Code 2026-09-30: eCode360 publication current through the 2026-09-30 codification (imported 2026-11-21)) · Escondido Municipal Code § 22-178

Corpus is an independent public-information project, not the official City of Escondido website. Stable reference: corpuslaw.us/code/b8f7c7c4-8175-42a0-97c5-797429816068

§ 22-178: Terms and conditions of wastewater discharge permit.

(a) A wastewater discharge permit shall include such terms and conditions as are deemed reasonably necessary by the director to prevent pass through or interference, protect the quality of the water body receiving the treatment plant's effluent, protect worker health and safety, facilitate sludge management and disposal, and protect against damage to the POTW. (b) Terms. A wastewater discharge permit shall be expressly subject to all provisions of this article and all other applicable regulations established by the city. An individual wastewater discharge permit must contain: (1) A statement that indicates the wastewater discharge permit issuance date, expiration date, and effective date; (2) A statement that the wastewater discharge permit is nontransferable without prior written consent of the director pursuant to section 22-181, and provisions for furnishing the new owner or operator with a copy of the existing wastewater discharge permit; (3) A group classification designation; (4) Effluent limits, including BMPs, based on applicable pretreatment standards; (5) Requirements for monitoring, self-monitoring, sampling, reporting, notification, and recordkeeping, including an identification of pollutants (or BMPs) to be monitored, sampling location, sampling frequency, and sample type based on federal, state, and local law; (6) Requirements for reports of initial and continuing compliances; (7) Requirements for pretreatment facilities; (8) A statement of applicable civil and criminal penalties for violation of pretreatment standards and pretreatment requirements, and any applicable compliance schedule, which may not extend the time for compliance beyond that required by applicable federal, state, or local law; (9) Requirements to control slug discharge, if determined by the director to be necessary. (c) Conditions. A wastewater discharge permit may contain, but need not be limited to, the following conditions: (1) Limits on average and maximum rate of discharge, restriction of discharge to certain hours of the day, or requirements for flow regulation and equalization; (2) Requirements for the installation of flow measurement or other facilities, including, but not limited to, the installation of pretreatment technology, pollution control, or construction of appropriate containment devices designed to reduce, eliminate, or prevent the introduction of pollutants into the POTW; (3) Requirements for the development and implementation of spill control plans or other special conditions, including management practices necessary to adequately prevent accidental, unanticipated, or nonroutine discharges; (4) Development and implementation of waste minimization plans to reduce the amount of pollutants discharged to the POTW; (5) The unit charge or schedule of user charges and fees for the management of the wastewater discharged to the POTW; (6) Requirements for installation and maintenance of inspection and sampling facilities and equipment, including flow measurement devices and city access to the facilities; (7) Specifications for monitoring programs that may include sampling locations; method of sampling; chemical constituents to be reported upon; frequency of sampling; and number, types, and standards for tests; (8) A statement that compliance with the wastewater discharge permit does not relieve the permittee of responsibility for compliance with all applicable federal and state pretreatment standards, including those that become effective during the term of the wastewater discharge permit; (9) A permit application fee; (10) Limitations on wastewater strength for the flow in each sewer connection lateral, including average and maximum concentrations of the wastewater constituents and characteristics; (11) Requirements for submission of technical reports or discharge reports, and authority for the director to copy all such reports kept at the premises of the user; (12) Requirements for maintaining and retaining plant records relating to wastewater discharge as specified by the city, and affording access to the city for the purposes of inspection and copying; (13) Requirements for facilities to prevent accidental discharge or slug discharge of prohibited materials or other wastes regulated by this article; and (14) Other conditions as deemed appropriate by the director to ensure compliance with this chapter or federal and state laws, regulations, or orders.

( Ord. No. 95-8 , § 1, 7-12-95 ; Ord. No. 2008-07 , § 1, 2-27-2008 ; Ord. No. 2011-18 , § 8, 12-14-11 ; Ord. No. 2018-01 , § 13, 4-4-18 ; Ord. No. 2021-16 , § 3, 10-27-21 )

Ask a question about Escondido law

Corpus searches the Escondido sections it holds and shows the ones that match, with their citations. Free, no sign-in.