§ 33-1326-5 — Irrigation schedule
Code of Ordinances, City of Escondido, California (Code 2026-09-30: eCode360 publication current through the 2026-09-30 codification (imported 2026-11-21)) · Escondido Zoning Code § 33-1326-5
Corpus is an independent public-information project, not the official City of Escondido website. Stable reference: corpuslaw.us/code/38f198c5-d092-4fa1-92a1-c6a2eb3e1b92
§ 33-1326-5: Irrigation schedule.
The irrigation schedule required by section 33-1335 shall be prepared by a licensed landscape architect, licensed civil engineer, licensed architect, or other landscape professional licensed by the state to do this work and provide the following information: (a) A description of the automatic irrigation system that will be used for the project; (b) The ETo data relied on to develop the irrigation schedule, including the source of the data; (c) The time period when overhead irrigation will be scheduled and confirm that no overhead irrigation shall be used between 10:00 a.m. and 6:00 p.m.; (d) The parameters used for setting the irrigation system controller for watering times for: (1) The plant establishment period, (2) Established landscaping, (3) Temporarily irrigated areas, (4) Different seasons during the year; (e) The consideration used for each station for the following factors: (1) The days between irrigation, (2) Station run time in minutes for each irrigation event, designed to avoid runoff, (3) Number of cycle starts required for each irrigation event, designed to avoid runoff, (4) Amount of water to be applied on a monthly basis, (5) The root depth setting, (6) The plant type setting, (7) The soil type, (8) The slope factor, (9) The shade factor.
( Ord. No. 2010-01 , § 4, 2-3-10 )
Ask a question about Escondido law
Corpus searches the Escondido sections it holds and shows the ones that match, with their citations. Free, no sign-in.
