§ 6-364 — Preliminary report required; waiver authorized
Code of Ordinances, City of Escondido, California (Code 2026-09-30: eCode360 publication current through the 2026-09-30 codification (imported 2026-11-21)) · Escondido Municipal Code § 6-364
Corpus is an independent public-information project, not the official City of Escondido website. Stable reference: corpuslaw.us/code/8730eb51-4f2e-4934-a3c2-a06bf3948bb5
§ 6-364: Preliminary report required; waiver authorized.
Prior to the issuance of a building permit for the construction of a building on a lot within a subdivision as defined in the Business and Professions Code, Sections 11535 and 11535.1, there shall be filed with the building director a preliminary soil report prepared by a civil engineer registered by the state, based upon such test borings or excavations as are approved by the building director as adequate; provided, however, such preliminary soil report may be waived by the building director where he determines that due to the knowledge his department has as to the qualities of the soil within the subdivision, no preliminary analysis is necessary.
( Code 1957, § 8501 )
Ask a question about Escondido law
Corpus searches the Escondido sections it holds and shows the ones that match, with their citations. Free, no sign-in.