§ 16.31.4: Moratorium.
A. Newly constructed or resurfaced streets shall be termed "Moratorium Streets" within this section. Permission to excavate in Moratorium Streets will not be granted for five (5) years after the completion of street overlays or reconstructions, which consists of at least a 1/2 inch thick layer of asphalt, and streets that have received a preventative maintenance seal. For the purpose of this section, the time shall be measured from the date the applicable project is substantially completed. Utilities shall plan well enough in advance to determine alternate methods of making necessary repairs to avoid excavating in newly resurfaced streets. Exceptions to the above policy are as follows: 1. Emergency excavations that are immediately necessary to protect life or property. 2. Repairs or modifications that are necessary to prevent interruption of essential utility service. 3. Work that is mandated by city, state, or federal law. 4. Excavations necessary to provide utility service for buildings where no other reasonable means of providing service exists. 5. Excavations, as determined by the City Engineer in writing, necessary for situations in which no alternative course of action exists. B. Exceptions of Section [A] notwithstanding, a waiver must be obtained to excavate in a Moratorium Street. 1. To request a waiver, the applicant must submit a written request to the City Engineer. The request must include: a. The location of the excavation. b. Description of the work to be performed. c. The reason(s) the work was not performed before the street was paved. d. The reason(s) the work cannot be deferred until after the moratorium period. e. The reason(s) the work cannot be performed at another location. f. The reason(s) it is justified to excavate the Moratorium Street. 2. Before issuing a waiver, the City Engineer will verify that the applicant has analyzed all feasible alternatives to make the necessary repairs using a trenchless method in the Moratorium Street to avoid excavating a newly resurfaced street whenever possible. The City Engineer shall grant a waiver if the applicant demonstrates that one or more of the circumstances under section 16.31.4(B)(1) exists. C. Any pavement restoration work on Moratorium Streets shall comply per the current City Standard Specifications and Details, however, the City Engineer may determine that alternative repaving requirements are appropriate due to circumstances unique to the restoration site. Exception: Full lane width pavement restoration shall not be required if the work is being performed on behalf of a low-income household in order to bring an owner-occupied single-family residence into compliance with sanitary sewer regulations at any time other than as part of the sale of the residence. Low-income is defined as 80% of area median family income. The purpose of this exception is to prevent hardship to property owners of limited means and it shall be interpreted and applied solely to achieve that purpose.
( Ord. No. 2020-16 , § 1 )
Ask a question about Fairfield law
Corpus searches the Fairfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.