For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 22.35.020 — Testing

City Code, City of Fairfield, California (Fairfield City Code includes legislation through 07-21-2026 (eCode360 publication FA4438, scraped 2026-11-21)) · Fairfield City Code § 22.35.020

Corpus is an independent public-information project, not the official City of Fairfield website. Stable reference: corpuslaw.us/code/81728ff3-13a5-454d-8fd9-fe2a239d0028

§ 22.35.020: Testing.

Customers may request a test to be made of the meter service serving their premises. Testing shall be conducted in conformance with American Water Works Association Manual M6, Chapter 5. Arrangements for such test shall be made within five working days after receipt of the request. The customer shall be notified twenty-four hours before the time set for the test. The request for meter tests must be accompanied by a cash deposit for the respective meter size, in accordance with fee schedule as adopted from time to time by city council. If the results of the meter test determine that the meter is: A. Registering not more than two percent faster or slower than the actual quantity of water passing through it, the deposit shall be retained by FMU; B. Registering more than two percent over registration, an accurate meter shall be installed, the deposit refunded and the water bills adjusted to correct the error discovered; C. Registering more than two percent under registration, an accurate rate meter shall be installed, the deposit refunded and the customer billed for the amount of the undercharge; D. In any event, the adjustment for overcharge or undercharge shall not exceed a period of six months or that during which it was measuring service to the customer, whichever is the lesser.

( Ord. No. 2025-13 , § 1 (Exh. A) )

Ask a question about Fairfield law

Corpus searches the Fairfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.