For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 22.50.020 — Zone connection charge

City Code, City of Fairfield, California (Fairfield City Code includes legislation through 07-21-2026 (eCode360 publication FA4438, scraped 2026-11-21)) · Fairfield City Code § 22.50.020

Corpus is an independent public-information project, not the official City of Fairfield website. Stable reference: corpuslaw.us/code/d524856b-9f73-4783-8b5d-29044c502f21

§ 22.50.020: Zone connection charge.

FMU shall collect the Zone connection charges for installation of new water services located above the Zone 1 maximum water system service elevation of 100 feet. Connection charges shall be determined based on the water meter capacity, consistent with section 22.31. Charges shall be in the amount as established by separate resolution duly adopted from time to time by city council. Zone connection charges shall, on April 1st of each year, automatically increase or decrease from the amounts then applicable by the same percentage as the percentage of increase or decrease in construction costs between December 1st of each of the two immediately preceding years. Construction costs and the increase or decrease therein shall be based on the Engineering News-Record Construction Cost Index for the San Francisco area.

( Ord. No. 2025-13 , § 1 (Exh. A) )

Ask a question about Fairfield law

Corpus searches the Fairfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.