For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 22B.130 — Construction site controls

City Code, City of Fairfield, California (Fairfield City Code includes legislation through 07-21-2026 (eCode360 publication FA4438, scraped 2026-11-21)) · Fairfield City Code § 22B.130

Corpus is an independent public-information project, not the official City of Fairfield website. Stable reference: corpuslaw.us/code/87d0965c-4a82-4464-bcee-83e6ccc01cf3

§ 22B.130: Construction site controls.

A. Any construction contractor performing work in the City, where discharge of stormwater to the City storm drain system is possible, shall at a minimum implement BMPs to retain any debris, dirt or other pollutant on the project site from flowing into the City’s storm drain system. The Public Works Director may establish controls on the volume and rate of stormwater runoff from new developments and redevelopments as may be appropriate to minimize the discharge and transport of pollutants. B. All construction sites must implement and maintain at least the following minimum best management practices: 1. Erosion control at the site; 2. Run-on and run-off controls to and from the site; 3. Control of sediments and fines on the site; 4. Active treatment systems (as necessary); 5. Good site management; and 6. Non-stormwater management.

( Ord. No. 2010-04 , § 1 )

Ask a question about Fairfield law

Corpus searches the Fairfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.