§ 25.32.11 — Wind Energy Conversion Systems
City Code, City of Fairfield, California (Fairfield City Code includes legislation through 07-21-2026 (eCode360 publication FA4438, scraped 2026-11-21)) · Fairfield City Code § 25.32.11
Corpus is an independent public-information project, not the official City of Fairfield website. Stable reference: corpuslaw.us/code/ad46b77f-1584-4717-bee8-624e8b781589
§ 25.32.11: Wind Energy Conversion Systems.
All Wind Energy Conversion Systems (WECS) shall be subject to the following requirements: A. Setbacks. All WECS shall comply with the following setbacks: Table 25-16: Setbacks for Wind Energy Conversion Systems All figures are minimum | Rotation Axis Horizontal | Vertical Setbacks ... downwind property lines | 5x rotor diameter | 1.25x tower height ... all other property lines | 2.5 rotor diameter | 1.25x tower height ... from above-ground utilities | 1.5 x rotor diameter | 1.25x tower height ... from other structures | 10 feet Rotor to ground clearance | 15 feet NOTE: For purposes of measuring the setback requirements established in Table 25-16, 1/2 of the width of any abutting creeks, irrigation channels, permanent drainage canals or street rights-of-way which are in a public ownership may be counted towards meeting the required setbacks. B. Ladders. The base of tower ladder(s) or other climbing apparatus shall be a minimum of 12 feet above the ground. C. Guy Wires. As a part of the installation, all WECS that use guy wires for tower support shall incorporate appropriate measures to protect the guy wires from damage which could cause tower failure. D. Noise. Any application for installation of a WECS shall be accompanied by data from the manufacturer or a competent acoustical consultant that documents the noise levels associated with its operation. No WECS shall be approved unless the noise levels comply with the appropriate policies of the Health and Safety Element of the General Plan. E. Operation. A WECS shall be maintained in operational condition at all times. Should a WECS become inoperable, or should any part of the WECS be damaged, the owner or operator shall remedy the situation within 90 days. If the City determines that the WECS owner or operator has not taken the action required above, the City may require the repair or removal of the WECS.
Ask a question about Fairfield law
Corpus searches the Fairfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.
