§ 30.24 — Design and construction requirements
City Code, City of Fairfield, California (Fairfield City Code includes legislation through 07-21-2026 (eCode360 publication FA4438, scraped 2026-11-21)) · Fairfield City Code § 30.24
Corpus is an independent public-information project, not the official City of Fairfield website. Stable reference: corpuslaw.us/code/3fca7e7e-3575-48bc-b299-3f2afd52abeb
§ 30.24: Design and construction requirements.
A. Grantee shall not construct any cable system facilities until Grantee has secured the necessary permits from Grantor and all other public agencies with permit authority. B. In those areas of the City where transmission or distribution facilities of the public utilities providing telephone and electric power service are underground, the Grantee likewise shall construct, operate and maintain its transmission and distribution facilities therein underground. Undergrounding shall be at Grantee’s own expense, except that Grantor shall require the subdivision developer to reimburse Grantee for the cable television system share of main line joint trench costs. C. In those areas of the City where Grantee’s cables are located on the above ground transmission or distribution facilities of the public utility providing telephone or electric power service, and in the event that the facilities of both such public utilities subsequently are placed underground, then the Grantee likewise shall reconstruct, operate and maintain its transmission and distribution facilities underground, at Grantee’s cost. Certain of Grantee’s equipment, such as pedestals, amplifiers and power supplies, which normally are placed above ground, may continue to remain in above ground enclosures, unless otherwise provided in the Franchise.
( Ord. No. 92-11 , § 1 )
Ask a question about Fairfield law
Corpus searches the Fairfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.
