§ 5.1.4.3: Permits.

Section 105.1 – Required. Add the following subsection to section 105.1 of the CBC: Section 105.1.3 Demolition. (A) | No wrecking or demolition of any building or structure shall be started until the person who will accomplish such wrecking, or demolition has obtained all necessary permits and has complied with all the provisions of this code. (B) | Prior to the start of any demolition work on any building or structure, all utilities to such building or structure shall be properly disconnected. Utility disconnection shall be performed or supervised by the proper governmental agency or utility company affected. Sewer laterals shall be capped at the property line and its location marked for identification. (C) | Prior to the issuance of a building permit or encroachment permit, and the start of any demolition or wrecking work on any building, structure, or property, the wrecker must obtain an Acknowledgment Letter from the Bay Area Air Quality Management District. (D) | The permittee shall take all necessary precautions to adequately protect adjacent properties, structures, and occupants. (E) | The permittee shall fill all excavation levels with adjoining grades not later than ten (10) days after a building or structure is demolished. (F) | The permittee shall provide all protection necessary to prevent damage to public property and shall be liable for the cost of repair or replacement of all damaged public property, including but not limited to, streets, sidewalks, alleys, streetlights, fire hydrants, and all other public utilities or structures located on public property. (G) | All debris, building material, and rubbish must be removed from the property not later than ten (10) days after the building or structure is razed. (H) | All dust resulting from wrecking or demolition operations shall be immediately settled by wetting the same with water of sufficient quantity to prevent the dust from leaving the site of the demolition or wrecking project. Demolition shall be stopped during periods of high winds that carry the dust from the site before it can be settled by wetting. The permittee shall be responsible for maintaining clean public streets during such operations. The permittee must obtain the necessary encroachment permits for any work done on public property. The permittee shall wash off public property to remove all silt and dust but must not enter the storm drain system. To prevent such material from entering the storm drain, the permittee shall properly pond the gutter to permit such material to settle, and it shall then be cleaned up and hauled away. This procedure shall be followed in accordance with the requirements and policies of the Public Works Department and the Clean Water Act. (I) | The permittee shall submit evidence of having liability insurance prior to approval and or commencement of any work. Section 105.1 – Required. Add the following subsection to section 105.1 of the CBC: Section 105.1.4 Moved buildings. No person shall move any building or structure into, from, or within the City, or cause same to be done, without first obtaining from the Building Official, a separate permit for each building or structure. Application for each permit shall be made to the Building Official in writing on a form furnished for such purpose. Each application shall contain the following: (A) | Name and address of the owner of the building. (B) | The location from which such a building is to be moved. (C) | Recent photographs showing at least three sides of each building. (D) | The name and address of the person who will move the building. (E) | The location to which such a building is to be moved. (F) | A plot plan of the new location, indicating dimensions and locations of the existing and proposed building, yards, and setbacks. (G) | An agreement by the applicant to perform the work necessary to make the building, when relocated, comply with, and conform to all applicable building laws of the State and of the city. (H) | An agreement that the site from which the building or structure is moved will, within a time fixed, be cleared of all garbage, rubbish, and waste matter, and leveled or barricaded to eliminate any hazards to persons or property in a manner prescribed by the Building Official. (I) | Approval from Community Development Department, Planning Division. (J) | Approval from Public Works Department, Engineering Division. (K) | Subsections F and G shall not apply when the building or structure is being moved outside the City. (L) | A permit shall not be issued for the moving of any building or portions thereof into or upon any public property or right-of-way of the City unless the permittee has secured public liability insurance, submitted proof of such insurance, and has obtained approval from the Public Works Department. Section 105.2 – Work exempt from permit: Replace, Building: Item 1, in section 105.2 of the CBC with the following: Building 1. One-story detached accessory structures, used as tool and storage sheds, playhouses, and similar uses, provided that the floor area does not exceed 120 square feet (11.15 m2), the structure meets setback and height limitation requirements as outlined in chapter 25 of the Fairfield Municipal Code. Section 105.2 – Work exempt from permit: Replace, Building: Item 9 in section 105.2 of the CBC with the following: Building: 9. Prefabricated swimming pools accessory to a Group R-3 occupancy that are less than 18 inches (457 mm) deep, are not greater than 5,000 gallons, (18,925L), and are installed entirely above ground. Section 105.2 – Work exempt from permit: Add the following to section 105.2 of the CBC: Building: 14. Repairs to roof covering not exceeding a total of 100 square feet within any 12-month period. Section 105.2 – Work exempt from permit: Add the following to section 105.2 of the CBC: Building: 15. Where projects are subject to the CRC, as defined in section 101.2 of the CBC, the exemptions in sections R105.2 through R105.2.2 of the CRC may be applied. Section 105.3 – Application for permit. Add the following to section 105.3.1 of the CBC: Section 105.3.1.1 – Conditions of issuance. Except as provided in "Exception 1", below, or by City Council action, or by recorded fee deferral agreement between the City and permittee, or meeting the provisions of Section 5.3.3 of the City Code, a building permit shall not be issued for any structure until: (A) | All applicable fees, including, but not limited to, purchase of water meter, construction water, sewer, and water connection fees, park and recreation fees, school impact fees, school development fees, school mitigation fees, construction license tax, Solano County facilities fee and those special charges for each facility described in the reimbursement agreements identified in Sec. 6B.6 of the City Code are paid. (B) | Any contractor or subcontractor who applies for permits to do work on said structure holds a current business license to do work in the city. (C) | Where an application for a building permit includes electrical, mechanical, and or plumbing work, a single permit shall be issued for all work specified in the application, except for commercial and industrial projects, where separate electrical, plumbing, or mechanical permits may be issued. (D) | No person to whom a permit has been issued shall transfer, assign, or convey such permit to another person for the purpose of completing the work for which the permit was issued. When the permittee to whom the permit has been issued no longer has a vested interest in the project or is no longer responsible for the project or work covered by the permit, the permit shall automatically become null and void. No person shall proceed with such a project or work without first obtaining a new permit. A permit to do or, to cause to be done, any work regulated by this code shall be issued only to persons holding a valid contractor’s license issued by the State of California authorizing said person to undertake such work or to a person exempt from the contractor’s licensing requirements of the State of California. Exception: The director of community development may reduce the amount of the park and recreation fees, water connection fees, construction license tax, purchase of water meters, and or other fees described in Section 105.3.1.1 above by the amount of the annual increase in those fees ("the incremental increase") under the following circumstances: (a) | The project for which a building permit is being applied was previously issued building permit(s) which have expired. (b) | Construction under the previously issued permit(s) began but was not completed. (c) | The project has been the subject of foreclosure, receivership, bankruptcy, or other similar proceedings. (d) | The applicant for the building permit(s) demonstrates to the satisfaction of the community development director, that payment of the incremental increase substantially decreases the possibility that the construction of the project will be completed. (e) | The community development director determines that the project’s state of partial construction creates a nuisance or otherwise provides an unsafe environment for the citizens of Fairfield. (f) | Upon written request by the applicant, the applicant may request credit for existing infrastructure already installed at the site. The community development director may authorize credit or a reduction in a fee or fees based on the existing infrastructure or impact. If authorized, in no case shall credit be granted more than the current fee or applied to different fees. The community development director shall condition any reduction of fees pursuant to this Exception upon the applicant’s completion of the project within a time certain. Section 105.3.2 – Time limitation of application. Replace section 105.3.2 of the CBC with the following section: Section 105.3.2 – Time limitation of application. An application for a permit for any proposed work shall be deemed to have been abandoned and expired one year after the date of filing or a permit has been issued. If an application has been pursued in good faith, an applicant who requests in writing prior to the expiration qualifies for a single one-year extension. Upon approval of the building official, a second one-year extension may be granted with just cause. The fee for a permit extension shall be as prescribed in the building division fee schedule. Section 105.5 – Expiration. Replace section 105.5 of the CBC with the following section: Section 105.5 – Expiration. Unless otherwise authorized or restricted, every permit issued by the chief building official under the provisions of this code shall expire and become null and void one year from the date of issuance. The chief building official may issue a permit for a lesser period when necessary to abate dangerous or substandard conditions. The chief building official may grant up to a maximum of two one-year extensions of an unexpired permit to any permittee who submits a request in writing, demonstrating justifiable cause for granting the extension. The fee for a permit extension shall be as prescribed in the building division fee schedule. Before any work can be recommenced on an expired permit, a new permit shall be obtained. All work done under a new permit shall comply with the most current edition of the codes in effect at the time a new permit for the remaining work is applied for and shall apply to that permit through the point of completion or expiration, whichever occurs first. Expired permits may be granted a one-time administrative 90 day extension upon approval of the chief building official, provided that the project has received all required inspections except for the final inspection approval. The fee for an administrative permit extension shall be as prescribed in the building division fee schedule.

( Ord. No. 2025-10 , § 1 )

Ask a question about Fairfield law

Corpus searches the Fairfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.