For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 7.16.3 — Performance of work by city; assessment

City Code, City of Fairfield, California (Fairfield City Code includes legislation through 07-21-2026 (eCode360 publication FA4438, scraped 2026-11-21)) · Fairfield City Code § 7.16.3

Corpus is an independent public-information project, not the official City of Fairfield website. Stable reference: corpuslaw.us/code/ebc7b612-a3b0-4ec4-ac78-68882c26f530

§ 7.16.3: Performance of work by city; assessment.

If upon the expiration of the ten day period specified in section 7.16.2, the required underground facilities have not been provided, the city engineer shall forthwith proceed to do the work; provided, however, if such premises are unoccupied and no electricity is being furnished thereto, the city engineer may, in lieu of providing the required underground facilities, order the disconnection of all existing connections used for furnishing electric and communication services to such premises. Upon completion of the work by the city engineer he shall file a written report with the council setting forth the fact that the required underground facilities have been provided and the cost thereof, together with a legal description of the property against which such cost is to be assessed. The council shall thereupon fix a time and place for hearing protests against the assessment of the cost of such premises, which time shall be not less than ten days thereafter.

( Ord. No. 68-6 )

Ask a question about Fairfield law

Corpus searches the Fairfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.