§ 23-537 — Water quality management plan; compliance and implementation
Code of the City of Fontana, California (Supp. No. 65: codified through Ordinance No. 1987, enacted April 28, 2026) · Fontana City Code § 23-537
Corpus is an independent public-information project, not the official City of Fontana website. Stable reference: corpuslaw.us/code/f4b6577e-28da-4455-80b1-7b116370ee7d
Sec. 23-537. - Water quality management plan; compliance and implementation.
The city engineer shall have the authority to require the preparation and implementation of a WQMP for any development, redevelopment, utility, or road improvement project within the city limits. (1) Prior to application submittal for plans examination, grading permit, building permit, or entitlement, a WQMP shall be prepared and submitted to the authorized city representative for all priority projects subject to this requirement under the applicable MS4 permit. The WQMP submittal requirement applies to construction projects covered by the construction general permit as well as construction projects with land disturbance of less than one acre. Qualifying development/redevelopment projects include: a. All significant redevelopment projects—defined as the addition or replacement of 5,000 or more square feet of impervious surface on an already developed site subject to the discretionary approval of the city. Significant redevelopment does not include routine maintenance activities that are conducted to maintain original line and grade, hydraulic capacity, original purpose of the facility, or emergency redevelopment activity required to protect public health and safety. Where redevelopment results in an increase of less than 50 percent of the impervious surfaces of a previously existing developed site, and the existing development was not subject to WQMP requirements, the numeric sizing criteria discussed in Section 4 of the of the San Bernardino County Stormwater Program Technical Guidance Document for Water Quality Management Plans, effective September 19, 2013, (WQMP Technical Guidance Document) and any amendments to that WQMP Technical Guidance Document shall apply only to the addition or replacement, and not to the entire developed site. Where redevelopment results in an increase of 50 percent or more of the impervious surfaces of a previously existing developed site, the numeric sizing criteria discussed in Section 4 of the current version of the WQMP Technical Guidance Document shall apply to the entire developed site. b. All new development projects that create 10,000 square feet or more of impervious surface (collectively over the entire development project site), including commercial, industrial, residential housing subdivisions (i.e., detached single-family home subdivisions, multifamily attached subdivisions or townhomes, condominiums, apartments, etc.), mixed-use, and public projects. New development projects include projects on public and private land that fall under the planning and building authority of the permitting jurisdiction. c. New development or significant redevelopment of automotive repair shops (with SIC Codes 5013, 5014, 5541, 7532-7534, 7536-7539) where the project creates, adds and/or replaces 5,000 square feet or more of impervious surface. d. New development or significant redevelopment of eating places (with SIC Code 5812) where the land area of project is 5,000 square feet or more. e. All hillside developments of 5,000 square feet or more that are located on areas with known erosive soil conditions or where the natural slope is 25 percent or more. f. Developments of 2,500 square feet of impervious surface or more adjacent to (within 200 feet) or discharging directly into environmentally sensitive areas or water bodies listed on the Clean Water Act, section 303(d) list of impaired waters. g. Parking lots of 5,000 square feet or more of impervious surfaces exposed to stormwater. The term "parking lot" is defined as land area or facility for the temporary parking or storage of motor vehicles. h. New development or significant redevelopment of retail gasoline outlets that are either 5,000 square feet or more or have a projected average daily traffic of 100 or more vehicles per day. i. Nonpriority/noncategory projects may be required by the city to implement applicable site design LID and LIP requirements. (2) Preliminary project-specific WQMPs shall be submitted as early as possible during the environmental review or planning phase (land use entitlement). The final project-specific must be consistent with the preliminary project-specific WQMP. The city may require additional information and submittals for final approval. (3) The WQMP shall be prepared in conformance with the WQMP Technical Guidance Document, or its successor, and template documents and other related guidance documents. (4) The WQMP shall incorporate and implement site design, source control and/or treatment control BMPs to minimize runoff, increase on-site infiltration, and improve water quality as necessary to meet current MS4 permit requirements. The WQMP must prioritize the use of LID treatment control measures and explain why LID treatment control measures cannot be used in order to propose another BMPs. The WQMP shall identify all BMPs that will be incorporated into the project to control post-construction stormwater and nonstormwater quality and quantity and shall be revised as necessary during the life of the project. a. The owner(s) shall demonstrate that the proposed structural BMPs will infiltrate, and/or adequately treat, the projected stormwater and urban runoff for the development project using the design standards for structural BMPs as specified in the applicable MS4 permit. b. All WQMPs shall include a maintenance schedule for all source control and treatment control BMPs, the owner(s) signed statement of responsibility for continued BMP maintenance, and a plan for continued maintenance responsibilities which must include signing a MOA as described in section 23-539. (5) No certificate of occupancy shall be issued for a development/redevelopment project without ensuring that all treatment control BMPs have been constructed as specified in the approved WQMP and will be maintained in compliance with the requirements of the municipal NPDES permit. (6) Owner(s) shall submit and have approved an application to amend an approved WQMP prior to altering any BMP design, size, material, manufacturer, or specification. If a BMP is altered without approval, owner(s) shall restore the BMPs back to the original specifications in the approved WQMP. Altering a BMP without prior approval may result in enforcement actions. (7) The city may, at its discretion, require updates and amendments to a previously approved WQMP when conditions warrant, up to and including: change or alteration in use of property, change or alteration of pollutant loads, inadequate pollutant removal BMPs, or any other circumstance where it can be established that current site conditions do not comply with the provisions of this chapter. (8) Establishment of a regulatory fee. The city council may establish a regulatory fee by resolution and may from time to time adjust the fee by resolution to recover the reasonable cost of permit issuance, administration, inspections, sampling, metering, and monitoring by the city engineer. Such fee shall cover, but not exceed, the full cost of permit issuance, administration, inspections, sampling, metering, and monitoring and shall be allocated in a manner that bears a fair and reasonable relationship to the activities of the fee payers that are relative to the need for the WQMP. (9) Compliance with the conditions and requirements of a WQMP shall not exempt any person from the requirement to independently comply with each provision of this article.
(Ord. No. 1980, § 3(Exh. A), 1-13-26)
Ask a question about Fontana law
Corpus searches the Fontana sections it holds and shows the ones that match, with their citations. Free, no sign-in.
