For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 25-255 — Breach; termination of permit

Code of the City of Fontana, California (Supp. No. 65: codified through Ordinance No. 1987, enacted April 28, 2026) · Fontana City Code § 25-255

Corpus is an independent public-information project, not the official City of Fontana website. Stable reference: corpuslaw.us/code/07aaae8a-d5a9-440e-a70c-31bf83a0fe5f

Sec. 25-255. - Breach; termination of permit.

(a) For breach. A wireless permit may be revoked for failure to comply with the conditions of the permit or applicable law. Upon revocation, the wireless facility must be removed; provided that removal of a support structure owned by city, a utility, or another entity authorized to maintain a support structure in the right-of-way need not be removed, but must be restored to its prior condition, except as specifically permitted by the city. All costs incurred by the city in connection with the revocation and removal shall be paid by entities who own or control any part of the wireless facility. (b) For installation without a permit. A wireless facility installed without a wireless permit (except for those exempted by this article) must be removed; provided that removal of support structure owned by city, a utility, or another entity authorized to maintain a support structure in the right-of-way need not be removed, but must be restored to its prior condition, except as specifically permitted by the city. All costs incurred by the city in connection with the revocation and removal shall be paid by entities who own or control any part of the wireless facility. (c) Violation. Any violation of this article will be subject to the penalties stipulated in section 1-7 of chapter 1 in the Fontana City Code (FCC).

(Ord. No. 1862, § 5(Exh. A), 1-26-21)

Ask a question about Fontana law

Corpus searches the Fontana sections it holds and shows the ones that match, with their citations. Free, no sign-in.