Sec. 26-185. - Survey and monuments.
(a) Survey. An accurate and complete field survey shall be made of the land to be subdivided. (1) A traverse sheet, in a form approved by the city engineer, giving latitudes, departures, area, curve data and coordinates and showing the mathematical closure, together with complete sets of blue line or black and white check prints for the final map, shall be submitted to the city engineer for checking and approval. The traverse of the exterior boundaries of the tract and of each block, when computed from field measurements of the ground, shall close within a limit of error required by the city engineer consistent with the character of the subdivided land. (2) Wherever the county surveyor, county engineer or city engineer has established a system of coordinates, then the survey may be in reference to such system. (3) All monuments, property lines, centerlines of streets, alleys and easements adjoining or within the tract shall be in reference to the survey. (b) Monuments. (1) Monuments shall be defined as consisting of either: a. New galvanized iron pipe not less than one inch in diameter and 36 inches long; or b. Reinforced concrete posts six inches by six inches in cross section or six inches in diameter and 30 inches long. (2) All monuments shall have a copper plate or disk securely attached to the top of the monument by a copper dowel or nail not less than 2½ inches long firmly embedded in concrete and marking the exact center. The registered licensed number of the engineer or surveyor shall be stamped upon the copper plate or disk. (3) In making the survey, the engineer or surveyor shall set monuments in such a manner that the property lines may be retraced in any area of the subdivision with a minimum of difficulty. (4) Where the exterior boundaries of the subdivision are existing street lines, and on all interior street lines of the subdivision, the engineer or surveyor shall set monuments in the street areas, preferably on the street centerline, and located so as to determine the street lines bounding each block. Due consideration shall be given to visibility of monuments, one from another, for the purpose intended. (5) In areas where streets are to be paved with Portland cement concrete, the monuments in the street areas shall be set so that the tops are at least 7½ inches below the top of the finished pavement grade and enclosed in cast iron receptacles with cast iron covers of a type acceptable to the city engineer set flush with the tops of finished pavement grade and supported independently of the monuments. Where other types of pavement are to be permitted, monuments of a type specified by the city engineer shall be installed. (6) Monuments may be set after approval of the final map but not later than the time of acceptance of the subdivision improvement by the city council, provided a cash deposit or approved bond in an amount set by the city engineer is filed by the subdivider with the city guaranteeing such work. (7) All monuments and their location shall be subject to inspection and approval by the city engineer. (8) Redwood or Douglas fir hubs, each two inches square in cross section and not less than 12 inches in length, or three-fourths-inch iron pipe 24 inches long, shall be driven flush with the surface of the ground at all lot corners, angle points and curve points where no monuments are set, and in each case the exact corner shall be marked by a metal tack.
(Code 1968, § 28-36)
Ask a question about Fontana law
Corpus searches the Fontana sections it holds and shows the ones that match, with their citations. Free, no sign-in.