Sec. 28-99. - Soil management report.
(a) In order to reduce runoff and encourage healthy plant growth, a soil management report shall be completed by the project applicant, or his/her designee, as follows: (1) Submit soil samples to a laboratory for analysis and recommendations. a. Soil sampling shall be conducted in accordance with laboratory protocol, including protocols regarding adequate sampling depth for the intended plants. b. The soil analysis shall include: 1. Soil texture; 2. Infiltration rate determined by laboratory test or soil texture infiltration rate table; 3. pH; 4. Total soluble salts; 5. Sodium; 6. Percent organic matter; and 7. Recommendations. c. In projects with multiple landscape installations (i.e. production home developments) a soil sampling rate of one in seven lots or approximately 15 percent will satisfy this requirement. Large landscape projects shall sample at a rate equivalent to one in seven lots. (2) The project applicant, or his/her designee, shall comply with one of the following: a. If significant mass grading is not planned, the soil analysis report shall be submitted to the city as part of the landscape documentation package; or b. If significant mass grading is planned, the soil analysis report shall be submitted to the city as part of the certificate of completion. (3) The soil analysis report shall be made available, in a timely manner, to the city landscape inspector or inspector designated by the city engineer, and to the landscape contractor prior to the installation of any plant material. (4) The project applicant, or his/her designee, shall submit to an inspection by a city landscape inspector or inspector designated by the city engineer, verifying implementation of soil management report recommendations.
(Ord. No. 1734, § 2, 11-24-15)
Ask a question about Fontana law
Corpus searches the Fontana sections it holds and shows the ones that match, with their citations. Free, no sign-in.