Sec. 30-631. - Application and procedures.
(a) Review procedures. All projects within a hillside overlay district and located on a lot with a slope of ten percent or greater shall be subject to review and approval of a hillside development permit (HDP) by the Director of Community Development or the Planning Commission in accordance with the provisions contained in this section. This requirement applies to all permits, including, but not limited to, grading permits, building permits, tentative parcel maps, tentative tract maps, conditional use permits, approved specific plans, planned unit developments, administrative site plan review, design review projects and associated plan review. (1) Staff review. The Director of Community Development shall review development proposal applications and impose conditions deemed appropriate under the circumstances described in this subsection. Projects that require grading for large flat areas, including, but not limited to, such items as tennis courts may be referred to the Planning Commission if determined necessary by the Director of Community Development. a. The average natural slopes on the lot are less than 15 percent. b. The final grading resulting in fills or excavations less than five feet in vertical depth, at their deepest point, measured from the natural ground surface. c. The excavations or fills, or any combination thereof, on any portion of a site, are less than 2,500 cubic yards. (2) Planning Commission review. The Planning Commission shall review development proposal applications and impose conditions deemed appropriate under the circumstances described in this subsection. a. The average natural slopes on the lot are equal to or greater than 15 percent. b. The final grading resulting in fills or excavations equal to or greater than five feet in vertical depth, at their deepest point, measured from the natural ground surface. c. The excavations or fills, or any combination thereof, on any portion of a site, are equal to or greater than 2,500 cubic yards. d. Any fill or excavation that will encroach onto or alter a natural drainage channel, blue line stream, waters of the United States, or other watercourse (prohibited unless alternative drainage is proposed). e. The application requires Planning Commission approval for development entitlements. f. The application has been referred to the Planning Commission by the Director of Community Development. (b) Interpretation of standards. If ambiguity arises concerning interpretation of the provisions contained in this division, the Director of Community Development shall review such instances to determine compliance with the provisions contained within this section or the matter may be referred to the Planning Commission for consideration. (c) Biotic resources management plan. The application shall be accompanied by a biotic resources management plan to be reviewed by City staff or a City hired consultant. The plan will be part of an initial study per CEQA. The plan shall include the following: (1) Biotic assessment. A complete assessment of flora and fauna within and adjacent to the project area, with particular emphasis upon identifying endangered, threatened, and locally unique species as well as sensitive and critical habitats. (2) Impacts. A discussion of direct, indirect and cumulative impacts anticipated to adversely affect biological resources. (3) Mitigation measures. An identification of effective mitigation measures to specifically affect such impacts to a level of insignificance. Besides impacts to the biotic resources identified above, mitigation measures shall also address potential adverse impacts from any increased runoff, sedimentation, soil erosion and urban pollutants on streams, watercourses, and sensitive habitats on or near the project site. (4) No net loss of sensitive habitats. The identified mitigation measures shall observe the state and federal policy of habitat values. In addition, a discussion of alternatives to not only minimizes adverse impacts to wildlife but also to include direct benefit to wildlife and wildlife habitat shall be included. Stream buffer areas and their maintenance in a natural condition through nonstructural flood control methods shall be incorporated into projects affecting watercourses to continue their high value as wildlife corridors. (5) Permits. If required by state and federal law, a discussion of the necessary biological permits (California Department of Fish and Game, State Fish and Game Code § 1600 or United States Army Corps of Engineers/Department of the Interior Fish and Wildlife Service, Clean Water Act Section 404) shall be included in the biotic resources management plan. The requirements of the California Environmental Quality Act and Guidelines shall also be incorporated into the plan. (6) Archaeological/historic/paleontological report. A site-specific archaeological/historic/paleontological report shall be presented for approval, which shall include identification of such resources on a project site; analysis of potential adverse impacts to such resources; and identification of effective mitigation measure to level potential adverse impacts to a level of insignificance. (d) Fire management plan/high fire severity zone. The application shall be accompanied by a fire management plan/fuel modification plan. These plans shall be submitted to the Planning Division incorporating the City's standard format and include, at a minimum, the following: (1) Special building standards. Such features should include at a minimum, one-hour-rated exteriors, non-flammable wood or plastic material on exteriors, double pane or tempered glazing, solid core doors, non-wood garage doors, no non-fire rated plastic or vinyl window frames, proper screening and orientation of vents, non-combustible/non-plastic decking and patio covers, no plastic and no combustible rain gutters. (2) Fuel modification zones. The fuel modification zone shall incorporate a vegetation management zone around all structures. The recommended vegetation management zones around property lines are as follows: in the northern area of the City, 300-foot wide zones are required; in the Jurupa Mountains, 200-foot wide zones are required. (3) Special building setbacks. The fire management plan shall incorporate minimum building set backs and building separation requirements. (4) Maintenance. The fuel modification plan shall include a maintenance plan for all designated fuel modification zones. (e) Fencing and landscaping plans. Prior to the issuance of any building permit for any building or structure to be located within any hillside overlay district, a fence and landscape plan shall be submitted to the Community Development Department for review and approval. The fencing and landscaping plans shall include fire retardant materials and plantings, with irrigation systems and conservation measures to provide for the natural habitat and erosion control.
Ask a question about Fontana law
Corpus searches the Fontana sections it holds and shows the ones that match, with their citations. Free, no sign-in.