§ 30-939 — Application process
Code of the City of Fontana, California (Supp. No. 65: codified through Ordinance No. 1987, enacted April 28, 2026) · Fontana Zoning and Development Code § 30-939
Corpus is an independent public-information project, not the official City of Fontana website. Stable reference: corpuslaw.us/code/866baa66-46e3-48fc-a09c-e2e38b0b04b5
Sec. 30-939. - Application process.
(a) Generally. Applications for a resource extraction permit or resource reclamation plan for surface mining or land reclamation projects shall be accepted only for areas identified as "regionally significant construction aggregate resource areas" on Exhibit CON-1 in the City of Fontana general plan conservation element and in the OS-R (open space resource) general plan land use designation, provided these areas are also zoned for industrial development (M-1 Planned Industrial; M-2 General Industrial). Applications shall be submitted on forms provided by the Planning Division and shall be filed in accordance with this article and any procedures established by the Planning Manager. (b) Application information. All documentation for resource extraction permits and resource reclamation plans shall be submitted to the City at one time. The following application information shall be submitted prior to considering a resource extraction permit or resource reclamation plan request: (1) A legal description of the entire property to be utilized for extractive use, accessory operations and reclamation, and a detailed plot plan that includes the following: a. The boundaries of the entire property drawn to scale and showing contour intervals of not more than five feet, defining the location and showing exterior boundaries of the area to be excavated. The plot plan shall also show the location of any existing structures, easements, watercourses, levees, drainage facilities, underground utilities and roads or improvements adjoining the property. b. A vehicular access plan showing all proposed exit routes designed in such a manner as to result in minimum additional vehicular traffic over residential streets. c. A topographic map prepared by a registered civil engineer or licensed surveyor or license photometric surveyor, and a complete report of soils and geologic investigation prepared by a registered civil engineer or registered engineering geologist. The topographic map shall be accompanied by a written report setting forth probable volume and depth of overburden and non-usable materials. d. A description of the proposed operation in all of its phases, including a phasing plan and schedule showing the approximate start date, the proposed increments of extraction and the sequence in which such increments will be accomplished. The plan shall also show the approximate future locations of any machinery and processing equipment, excluding vehicles that may be moved during the excavation operations. The plan shall also show the location of proposed buildings and structures, processing plants and other appurtenant equipment, areas to be excavated and their approximate depths, storage of topsoil and overburden, stockpiles, points of ingress and egress, driveways, parking areas, and required setbacks, fencing, berms and screen planting. Where operations include the washing of sand and gravel, the estimated daily quantity of water required and its source and disposition shall also be made a part of this description and application materials. e. A plan showing the location of proposed protective works, settling basins, desilting ponds and other bodies of water, including a description of the provisions to be taken for the conservation and protection of groundwater, the disposition of drainage and control of erosion. f. A statement of the estimated time required to complete the proposed excavation. g. An initial study questionnaire and such other environmental documentation that may be required by the City, as outlined in the City's environmental guidelines. (2) For resource reclamation plans, as many copies of the application as may be required shall also be submitted in conjunction with all applications for a resource extraction permit. Resource reclamation plan requests shall contain detailed information concerning each of the elements required by state law (Public Resources Code §§ 2772 through 2773), other applicable state regulations, and any other requirements deemed necessary to facilitate an expeditious and fair evaluation of the resource reclamation plan request, including, but not limited to, the following: a. A final plan, showing the property as it will be prepared for installation and establishment of the proposed ultimate use; b. A phasing plan showing how the area will be incrementally restored to a natural appealing or otherwise usable condition as excavation operations are completed in one area and moved to the next area; c. A statement and plan describing the proposed rehabilitation methods and procedures including, but not limited to, the following: 1. Landscaping plans; 2. Drainage plans and facilities; and 3. Slope stability and erosion control plans. All such plans are to be approved by the Director of Community Development or designee; d. An assessment of the effect of implementation of the rehabilitation plan on future mining in the area. e. For surface mining operations that are exempt from the resource extraction permit requirements pursuant to this article, a resource reclamation plan shall nevertheless be submitted by the applicant that also includes information concerning the exempt mining activity.
Ask a question about Fontana law
Corpus searches the Fontana sections it holds and shows the ones that match, with their citations. Free, no sign-in.