For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 5-605 — Applicant obligations

Code of the City of Fontana, California (Supp. No. 65: codified through Ordinance No. 1987, enacted April 28, 2026) · Fontana City Code § 5-605

Corpus is an independent public-information project, not the official City of Fontana website. Stable reference: corpuslaw.us/code/0beb6ca4-ac06-4117-b969-b989802dd9d3

Sec. 5-605. - Applicant obligations.

(a) Prior to submitting an application, the applicant shall: (1) Verify, to the applicant's reasonable satisfaction, through the use of standard engineering evaluation techniques that the support structure for the small residential rooftop solar energy system is stable and adequate to transfer all wind, seismic, and dead and live loads associated with the system to the building foundation; and (2) At the applicant's cost, verify to the applicant's reasonable satisfaction, using standard electrical inspection techniques that the existing electrical system including existing line, load, ground and bonding wiring as well as main panel and subpanel sizes are adequately sized, based on the existing electrical system's current use, to carry all new photovoltaic electrical loads.

(Ord. No. 1732, § 1, 8-25-15)

Ask a question about Fontana law

Corpus searches the Fontana sections it holds and shows the ones that match, with their citations. Free, no sign-in.