For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 9-73 — Alternative energy

Code of the City of Fontana, California (Supp. No. 65: codified through Ordinance No. 1987, enacted April 28, 2026) · Fontana City Code § 9-73

Corpus is an independent public-information project, not the official City of Fontana website. Stable reference: corpuslaw.us/code/71dc9bf9-49f0-4cea-8b8f-a74b39ad3473

Sec. 9-73. - Alternative energy.

(a) On-site motorized operational equipment shall be ZE (zero emission). (b) All building roofs shall be solar-ready, which includes designing and constructing buildings in a manner that facilitates and optimizes the installation of a rooftop solar photovoltaic (PV) system at some point after the building has been constructed. (c) The office portion of a building's rooftop that is not covered with solar panels or other utilities shall be constructed with light colored roofing material with a solar reflective index ("SRI") of not less than 78. This material shall be the minimum solar reflective rating of the roof material for the life of the building. (d) On buildings over 400,000 square feet, prior to issuance of a business license, the city shall ensure rooftop solar panels are installed and operated in such a manner that they will supply 100 percent of the power needed to operate all non-refrigerated portions of the facility including the parking areas. (e) At least ten percent of all passenger vehicle parking spaces shall be electric vehicle (EV) ready, with all necessary conduit and related appurtenances installed. At least five percent of all passenger vehicle parking spaces shall be equipped with working Level 2 Quick charge EV charging stations installed and operational, prior to building occupancy. Signage shall be installed indicating EV charging stations and specifying that spaces are reserved for clean air/EV vehicles. Unless superior technology is developed that would replace the EV charging units, facility operator and any successors in interest shall be responsible for maintaining the EV charging stations in working order for the life of the facility. (f) Unless the owner of the facility records a covenant on the title of the underlying property ensuring that the property cannot be used to provide chilled, cooled, or freezer warehouse space, a conduit shall be installed during construction of the building shell from the electrical room to 100 percent of the loading dock doors that have potential to serve the refrigerated space. When tenant improvement building permits are issued for any refrigerated warehouse space, electric plug-in units shall be installed at every dock door servicing the refrigerated space to allow transport refrigeration units (TRUs) to plug in. Truck operators with TRUs shall be required to utilize electric plug-in units when at loading docks. (g) Bicycle racks are required per section 30-714 and in the amount required for warehouse uses by table 30-714 of the zoning and development code. The racks shall include locks as well as electric plugs to charge electric bikes. The racks shall be located as close as possible to employee entrance(s). Nothing in this section shall preclude the warehouse operator from satisfying this requirement by utilizing bicycle parking amenities considered to be superior such as locating bicycle parking facilities indoors or providing bicycle lockers.

(Ord. No. 1879, § 6, 2-8-22; Ord. No. 1891, § 2, 4-12-22)

Ask a question about Fontana law

Corpus searches the Fontana sections it holds and shows the ones that match, with their citations. Free, no sign-in.