§ 15.63.060 — Permit review and inspection requirements
Fremont Municipal Code (Fremont Municipal Code current through Ordinance 02-2026 passed May 5, 2026 (Code Publishing Company, codepublishing.com, scraped 2026-11-18)) · Fremont Municipal Code § 15.63.060
Corpus is an independent public-information project, not the official City of Fremont website. Stable reference: corpuslaw.us/code/0b57789e-01fd-460a-a5c7-d79d453de182
15.63.060 Permit review and inspection requirements.
(a) The building official shall implement an administrative, nondiscretionary review process to expedite approval of small residential rooftop solar energy systems. Where the application meets the requirements of the approved checklist and standard plan, the building and safety division shall complete the building permit approval or denial process, the issuance of which is nondiscretionary, on the same day for over-the-counter applications or between one and three days where such over-the-counter approval is not authorized or feasible. Review of the application for small residential rooftop solar energy systems shall be limited to the building official’s review of whether the application meets local, state, and federal health and safety requirements. (b) The building official may require an applicant to apply for a “solar use permit” if the building official finds, based on the initial application submittal, that the solar energy system could have a specific, adverse impact upon the public health and safety. The building official’s decision may be appealed to the planning commission in accordance with Chapter 18.300. (c) If a solar use permit is required, the building official may only deny an application for the solar use permit if the official makes written findings based upon substantial evidence in the record that the proposed installation would have a specific, adverse impact upon public health or safety and there is no feasible method to satisfactorily mitigate or avoid, the adverse impact. Such findings shall include the basis for the rejection of the potential feasible alternative for preventing the adverse impact. Such decisions may be appealed to the planning commission in accordance with Chapter 18.300. (d) If the building official issues a solar use permit, the permit may include conditions designed to mitigate the specific, adverse impact upon health and safety at the lowest possible cost. (e) A feasible method to satisfactorily mitigate or avoid the specific, adverse impact includes, but is not limited to, any cost-effective method, condition, or mitigation imposed by the city on another similarly situated application in a prior successful application for a permit. The city shall use its best efforts to ensure that the selected method, condition, or mitigation meets the conditions of Cal. Civ. Code § 714(d)(1)(A) and (B) defining restrictions that do not significantly increase the cost of the system or decrease its efficiency or specified performance. (f) If an application is deemed incomplete, a written correction notice detailing all deficiencies in the application and any additional information or documentation required to be eligible for expedited permit issuance shall be sent to the applicant for resubmission. (g) Only one inspection shall be required and performed by the building and safety division for small residential rooftop solar energy systems eligible for expedited review. The inspection shall be done in a timely manner and should include consolidated inspections. If a small residential rooftop solar energy system fails inspection, a subsequent inspection is authorized. (Ord. 18-2015 § 1, 7-7-15.)
Ask a question about Fremont law
Corpus searches the Fremont sections it holds and shows the ones that match, with their citations. Free, no sign-in.