§ 18.150.070 — Final reclamation plans – Subsequent approvals
Fremont Municipal Code (Fremont Municipal Code current through Ordinance 02-2026 passed May 5, 2026 (Code Publishing Company, codepublishing.com, scraped 2026-11-18)) · Fremont Municipal Code § 18.150.070
Corpus is an independent public-information project, not the official City of Fremont website. Stable reference: corpuslaw.us/code/a99ea864-ca2e-4573-b02e-f2193092bde6
18.150.070 Final reclamation plans – Subsequent approvals.
(a) Not less than six months, or other date considered appropriate by the planning commission at the time the reclamation plan is submitted, prior to completion of quarry operations within an approved phase of the quarry operation, there shall be submitted for commission approval a final reclamation plan. The final reclamation plan shall be a detailed plan drawn to a scale of one inch equals 100 feet or such other scale as the city engineer may require, and shall: (1) Be in general conformance with the reclamation plan approved in conjunction with the approval of the conditional use permit; (2) Include a plan for landscaping, irrigation and drainage facilities proposed to be installed; (3) Contain existing and proposed topographic information with a contour interval of five feet. The planning commission shall also consider, at such time or at appropriate subsequent intervals, the next phase as affected by the final reclamation of the previous phase, and may attach conditions regarding the preparation of the final reclamation plan for such next phase which appear warranted by knowledge of the actual effect of the quarry operation and the performance of the final reclamation plan for the previous phase. (b) Upon approval by the commission of the detailed final reclamation plan, the permittee shall proceed with reclamation of the phase where quarrying is complete, and may commence quarrying within the next phase as approved by the planning commission. The permittee shall provide a contract and guarantees for the subsequent phase as specified in Section 18.150.060. Upon completion of reclamation of a phase, the city shall return the financial guarantees previously posted for that phase. Reclamation shall include the grading and shaping of the land, the establishment of finished grades and the installation of landscaping and irrigation facilities necessary to stabilize slopes and control erosion completed in accordance with the approved reclamation plan. (Ord. 734 § 2; Ord. 2352 § 6, 9-14-99; Ord. 5-2008 § 15, 4-1-08. 1990 Code § 8-21836.)
Ask a question about Fremont law
Corpus searches the Fremont sections it holds and shows the ones that match, with their citations. Free, no sign-in.
