18.180.060 Post-disaster repair/reconstruction of nonconforming structures.
(a) Notwithstanding other provisions of this chapter, dwellings or commercial structures, as defined by this title, which were legal nonconforming structures when destroyed by an event, as defined in Section 15.90.040(a), or were legal nonconforming when ordered demolished due to the threat posed to public health and safety as a result of damages caused by an event (per Section 15.90.040(a)), may be reconstructed in the same location, configuration, floor area, and height as the original structure, provided: (1) They are constructed of approved materials which maintain the aesthetic characteristics and aspects of the damaged structure. (2) Construction shall comply with the then-current building code as adopted in Title 15. (3) All parts or portions of the original construction are completely removed, except as approved by the building official. (4) The site is prepared in accordance with a foundation report prepared by an individual registered by the state to perform foundation investigations whenever required by the city building code in effect at the time of reconstruction. (5) The owner shall conform to the timetable of Chapter 15.70. (b) Reconstruction of a partially damaged building shall be compatible with the architecture of the remaining portion of the building. (c) Reconstruction will be allowed pursuant to subsection (a) of this section only if a building permit is obtained and construction commences within two years of the date of the declaration of emergency. In the event it can be demonstrated that the failure to obtain a building permit was caused by factors outside of the control of the property owner, an extension may be granted by the building official up to a maximum of three years from the date of the declaration of emergency. The burden of proof as to the legal nonconforming status of the structure shall be borne by the property owner. (Ord. 9-2014 § 25, 3-4-14.)
Ask a question about Fremont law
Corpus searches the Fremont sections it holds and shows the ones that match, with their citations. Free, no sign-in.