§ 18.185.050 — Solar energy systems
Fremont Municipal Code (Fremont Municipal Code current through Ordinance 02-2026 passed May 5, 2026 (Code Publishing Company, codepublishing.com, scraped 2026-11-18)) · Fremont Municipal Code § 18.185.050
Corpus is an independent public-information project, not the official City of Fremont website. Stable reference: corpuslaw.us/code/3ee11d2a-5908-4f92-b457-aa5dd716fcca
18.185.050 Solar energy systems.
(a) Permitted Accessory Use. Solar energy systems (roof or ground mount) are permitted accessory uses in all zoning districts subject to the regulations in this article, the provisions of the Hill Area Initiative of 2002 and accessory use standards. Ground-mounted solar energy systems are also subject to Chapter 18.235, Design Review Permits. (b) Siting and Locational Standards. Solar energy systems shall be located and constructed as follows: | Standards | Roof-Mounted Solar Panels | Ground-Mounted Solar Arrays | Maximum height of system | n/a | 12 feet on residential designated parcels and parcels used for residential, 24 feet in all other districts. | Location on parcel | n/a | Rear yard on residential designated parcels and parcels used for residential; and front, side or rear yard in all other zoning districts. | Maximum parcel coverage | n/a | Residential parcels subject to detached accessory structure provisions under Chapter 18.153. Fifty percent of entire parcel in all other designations. | Separation requirements to buildings and property lines | n/a | Subject to detached accessory structure provisions under Chapter 18.153. (c) Other Requirements. (1) Security. Ground-mounted solar arrays located on commercial or industrial designated lands and visible from the public right-of-way are encouraged to be secured with fencing that is decorative in nature. (2) Feeder Lines. Feeder lines and any other appurtenant equipment serving the solar energy system are encouraged to be screened to the maximum extent possible or placed underground where screening is not feasible. (3) Abandonment of Use. If a ground-mounted solar energy system remains nonfunctional or inoperative for a period of one year it shall be deemed abandoned and shall be dismantled and removed from the property at the expense of the property owner. (d) Demonstration Systems. Nothing in this chapter is meant to restrict or discourage the use of solar energy systems for the purposes of demonstrating their operational characteristics by commercial or industrial businesses involved in the sale or manufacturing of such systems. However, such demonstration systems are permitted only as an accessory use to a principally permitted use. Demonstration systems may be located on a separate parcel only if that parcel is adjacent to the parcel on which the principal use is located and where both parcels contain the same general plan land use designation. (e) Solar Arrays in Parking Lots. Where solar arrays are installed over parking lots, the portion of the parking lot covered by the array is exempt from the tree planting requirements of Section 18.183.110(e)(4)(B). The applicability of this exemption shall be reviewed through the design review permit process of Chapter 18.235. All other landscape requirements shall apply. Any removal of trees shall be governed by the tree preservation ordinance as set forth in Chapter 18.215. (Ord. 7-2012 § 1, 5-1-12; Ord. 9-2014 § 27, 3-4-14. 1990 Code § 8-22054.)
Ask a question about Fremont law
Corpus searches the Fremont sections it holds and shows the ones that match, with their citations. Free, no sign-in.
