For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 8.40.570 — Definitions

Fremont Municipal Code (Fremont Municipal Code current through Ordinance 02-2026 passed May 5, 2026 (Code Publishing Company, codepublishing.com, scraped 2026-11-18)) · Fremont Municipal Code § 8.40.570

Corpus is an independent public-information project, not the official City of Fremont website. Stable reference: corpuslaw.us/code/5571fe64-4d4f-49a0-9864-0dba7771ce59

8.40.570 Definitions.

These definitions apply to this article only. “Applicant” means any individual, firm, limited liability company, association, partnership, political subdivision, government agency, municipality, industry, public or private corporation, or any other entity whatsoever who undertakes any construction, demolition or renovation project within the city. “Construction” means the building of any facility or structure or any portion thereof including any tenant improvements to an existing facility or structure. “Construction and demolition debris” (C&D) means materials generated as a result of construction, remodeling, repair or demolition on pavement, houses, commercial buildings and other structures as well as construction job sites, including without limitation discarded packaging, containers and waste construction materials, whether brought on site for fabrication or used in construction or resulting from demolition, excluding liquid waste, hazardous waste, and medical and infectious waste. Construction and demolition debris generally contains both municipal solid waste and recyclable materials. “Conversion rate” means the rate set forth in the standardized conversion rate table approved by the city pursuant to this article for use in estimating the volume or weight of materials. “Covered project” has the meaning set forth in Section 8.40.580. “Debris disposal and diversion report” means a report, to be completed and submitted by the applicant at the conclusion of a covered project, which documents the total tonnage of materials generated by the construction or demolition project, and the tons diverted and/or landfilled. “Demolition” means the decimating, razing, ruining, tearing down or wrecking of any facility, structure, pavement or building, whether in whole or in part, whether interior or exterior. “Disposal” means the management of solid waste through landfilling or transformation at permitted solid waste facilities. “Diversion” means activities which reduce or eliminate the amount of solid waste from solid waste disposal for purposes of this code. “Diversion requirement” means the level of reuse and/or recycling required in the residential mandatory measures and nonresidential mandatory measures, as applicable, as stated in the most current version of the construction waste reduction, disposal and recycling sections of the California Green Building Standards Code. If at any time the city of Fremont chooses to increase the diversion requirement more than these described mandatory measures, the stricter requirement will apply. “Divert” means to use material for any purpose other than disposal in a landfill, including reuse and recycling. “Exempt project” has the meaning set forth in Section 8.40.580. “Project” means any activity involving construction, demolition, or renovation in the city which requires issuance of a demolition permit, building permit or other similar permit from the city. “Project” also includes city public project construction, demolition or renovation. “Project diversion requirement” means “diversion requirement” as defined in this section or such other diversion requirement as may be established for a project by the WHP compliance official pursuant to the exception process set forth in Section 8.40.610. “Recycle” or “recycling” has the same meaning as that set forth in Section 8.40.040. “Renovation” means any change, addition, or modification in an existing structure. “Reuse” means using an object or material again, either for its original purpose or for a similar purpose, without significantly altering the physical form of the object or material, either on the current construction site or for later reuse off site. “Salvage” or “deconstruction” means the controlled removal of construction and demolition debris from a construction or demolition site for the purpose of reuse or storage for later recycling or reuse. “Self-haul” or “self-hauling” means a generator who transports his or her own permitted materials by using a vehicle owned by that generator and driven by the generator or the generator’s employees rather than using the hauling services of the franchise collector or a third-party hauling company. “Waste handling plan (WHP)” means a documented plan to manage all the materials generated on a project, to be completed and submitted by the applicant or contractor for any covered project prior to issuance of a building permit, demolition permit or other similar city permit. “WHP compliance official” means the manager of the environmental services division or designee. (Ord. 11-2021 § 1, 11-16-21.)

Ask a question about Fremont law

Corpus searches the Fremont sections it holds and shows the ones that match, with their citations. Free, no sign-in.