For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 18.08.020 — Compliance Requirements

Code of Ordinances, City of Garden Grove, California (Code 2026-08-11) · Garden Grove Code of Ordinances § 18.08.020

Corpus is an independent public-information project, not the official City of Garden Grove website. Stable reference: corpuslaw.us/code/9f6a5d66-fedd-465b-bb4f-444515a492ef

§ 18.08.020: Compliance Requirements.

A. The owner of each building within the scope of this section shall, upon service of an order and within the time limits set forth in this section, cause a structural analysis to be made of the building by a State of California registered professional civil or structural engineer or a State of California licensed architect, and if the building does not comply with earthquake standards specified in this section, the owner shall cause it to be structurally altered to conform to such standards or shall cause the building to be demolished. B. The owner of a building within the scope of this section shall comply with the requirements set forth above by submitting to the Building Official for review within the stated time limits: 1. Within 270 days after service of the order, a structural analysis, which is subject to approval by the Building Official, and which shall demonstrate that the building meets the minimum requirements of this section; 2. Within 270 days after service of the order, the structural analysis and plans for structural alteration of the building to comply with this section; 3. Within 120 days after service of the order, plans for the installation of wall anchors and parapet bracing and exterior wall appendage removal or stabilization in accordance with the requirements specified in Section A110 of Appendix Chapter 1, Uniform Code for Building Conservation, 1991 Edition; or 4. Within 270 days after service of the order, plans for the demolition of the building. C. After plans are submitted and approved by the Building Official, the owner shall obtain a building permit and then commence and complete the required construction or demolition within the time limits set forth in Table No. A-1-G (Section 18.08.040). These time limits shall begin to run from the date the order is served in accordance with Section 18.08.030, except that the time limit to commence structural alterations or building demolition shall begin to run from the date the building permit is issued. D. Owners electing to comply with subsection (B)(3) of this section are also required to comply with subsection (B)(2) or (B)(4) of this section; provided, however, that the 270-day period provided for in subsection (B)(2) or (B)(4) and the time limits for obtaining a building permit and to complete structural alterations or building demolition set forth in Table No. A-1-G may be extended in accordance with Table No. A-1-H (Section 18.08.050). Each such extended time limit shall begin to run from the date the order is served, in accordance with Section 18.08.030, except that the time limit to commence structural alterations or demolition shall begin to run from the date the building permit is issued.

( 2718 § 3, 2007 ; 2800 § 2, 2011 )

Ask a question about Garden Grove law

Corpus searches the Garden Grove sections it holds and shows the ones that match, with their citations. Free, no sign-in.