§ 2.52.020 — Design-Build Procurement Method for Qualifying Projects
Code of Ordinances, City of Garden Grove, California (Code 2026-08-11) · Garden Grove Code of Ordinances § 2.52.020
Corpus is an independent public-information project, not the official City of Garden Grove website. Stable reference: corpuslaw.us/code/5ba759fe-96e8-41ac-81aa-0824d235eb1c
§ 2.52.020: Design-Build Procurement Method for Qualifying Projects.
A. The purpose and intent of this section is to provide an alternative method for the award of contracts for qualifying projects as provided for in Public Contract Code Section 22160 et seq. It is the intent of this section to incorporate by reference all applicable definitions and procedures as set forth in Public Contract Code Section 22160 et seq. B. Definitions. "Best-value" means a value determined by evaluation of objective criteria that may include, but not be limited to, price, features, functions, life-cycle costs, experience, and past performance. A best value determination may involve the selection of the lowest cost proposal meeting the interests of the City and meeting the objectives of the project, selection of the best proposal for a stipulated sum established by the City, or a tradeoff between price and other specified factors. "Design-build" means a project delivery process in which both the design and construction of a project are procured from a single entity. "Design-build entity" means a corporation, limited liability company, partnership, joint venture, or other legal entity that is able to provide appropriately licensed contracting, architectural, and engineering services as needed pursuant to a design-build contract. "Qualifying project" means the construction of a building or buildings and improvements directly related to the construction of a building or buildings, and park and recreational facilities, excluding other infrastructure such as streets and highways, water, and sewer distribution facilities. C. The Finance Director may use the design-build contract procurement method for qualifying projects in excess of $1,000,000.00 subject to the procedures and requirements of Public Contract Code Section 22160 et seq. The design-build contract shall be awarded to the design-build entity providing the lowest bid or best value.
( 2865 § 1, 2016 )
Ask a question about Garden Grove law
Corpus searches the Garden Grove sections it holds and shows the ones that match, with their citations. Free, no sign-in.