§ 8.58.090: Construction and demolition diversion worksheet.
A. On Site Practices: During the covered project term, the applicant shall divert the required percentage of project C&D debris and report all diversion in a construction and demolition diversion worksheet to the building official. The building official will evaluate and may monitor each covered project to determine the percentage of waste recycled or reused from the covered project. For covered projects that involve both construction/renovation and demolition activities, diversion materials from demolition activities shall be tracked and measured separately from diversion of materials from construction/renovation activities. To the maximum extent feasible, Project C&D debris shall be separated on site, if this practice increases diversion. For construction, demolition and/or renovation projects, on-site separation shall include, but be not limited to, salvageable materials (e.g., fixtures, appliances, and other similar items), dimensional lumber, wallboard, concrete and corrugated cardboard. B. Documentation. The construction waste management plan, final construction and demolition diversion worksheet and original tags from a certified mixed-debris recycling facility documenting project diversion are required no later than 60 days from the completion of a covered project. The applicant shall submit the necessary documentation to the building official for approval, per the requirements of Sections 8.58.070 through 8.58.090 including the approved construction waste management plan, Construction and Demolition Worksheet and original tags documenting project diversion. C. The construction and demolition worksheet must include: 1. The dates of the demolition and/or construction; 2. Original receipts from all certified mixed debris recycling facilities where project C&D debris was recycled and/or salvaged. These receipts must document the waste diversion method used (ex. recycling, reuse and/or composting) noting specific volumes and/or material weights. 3. Original receipts (no photocopies) from all certified mixed debris recycling facilities which received the construction and demolition debris, indicating actual weights and volumes for each load of material accepted. Receipts must be for the covered project and include dates and project address. 4. Receipts reflecting proper disposal of universal waste from the covered project. 5. Copy of the approved construction waste management plan.
( Ord. 5895 § 1, 2017 ; Ord. 5933 § 31, 2019 )
Ask a question about Glendale law
Corpus searches the Glendale sections it holds and shows the ones that match, with their citations. Free, no sign-in.